About: ABS-CBN Soundstage     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Building, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FABS-CBN_Soundstage&invfp=IFP_OFF&sas=SAME_AS_OFF&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The ABS-CBN Soundstage (Horizon IT Park) in San Jose del Monte, Bulacan, is the second headquarters and production facility of ABS-CBN. It is owned by ABS-CBN Corporation and it is operated and managed by ABS-CBN Studios, Inc. The production hub will also include back lots, production and post-production facilities and offices. It is a part of ABS-CBN's Horizon IT Park which sits on 7.7 hectares of land in San Jose del Monte Bulacan. As of 2018, it has 2 stages in one soundstage, the first stage is the EL3 Stage, which is named after Eugenio Lopez III. The other soundstage, which includes Stage 3 & 4 are still under construction. It is used by ABS-CBN Films and ABS-CBN Entertainment. The park is planned to have 10 soundstages which consists of 20 stages each. The area also includes parking

AttributesValues
rdf:type
rdfs:label
  • ABS-CBN Soundstage (en)
rdfs:comment
  • The ABS-CBN Soundstage (Horizon IT Park) in San Jose del Monte, Bulacan, is the second headquarters and production facility of ABS-CBN. It is owned by ABS-CBN Corporation and it is operated and managed by ABS-CBN Studios, Inc. The production hub will also include back lots, production and post-production facilities and offices. It is a part of ABS-CBN's Horizon IT Park which sits on 7.7 hectares of land in San Jose del Monte Bulacan. As of 2018, it has 2 stages in one soundstage, the first stage is the EL3 Stage, which is named after Eugenio Lopez III. The other soundstage, which includes Stage 3 & 4 are still under construction. It is used by ABS-CBN Films and ABS-CBN Entertainment. The park is planned to have 10 soundstages which consists of 20 stages each. The area also includes parking (en)
foaf:name
  • ABS-CBN Soundstage (Horizon IT Park) (en)
name
  • ABS-CBN Soundstage (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
stop date
  • (en)
  • December 2018 (en)
alternate names
  • Horizon IT Park (en)
architectural style
  • Modern (en)
architecture firm
  • Bastien and Associates , AIDEA , with a consultants from Hollywood-based Manhattan Beach Studios (en)
building type
  • Studio, soundstage, broadcasting, production facility, back lots, storage, visitors center, post production facility, offices, support building (en)
cost
  • ₱ 6 to 7.5 Billion (en)
  • ₱ 700 Million (en)
current tenants
date
  • August 2022 (en)
floor area
  • 1,500 m (en)
floor count
height
inauguration date
landlord
  • ABS-CBN Studios, Inc. (en)
location
  • Igay Road, San Jose del Monte, Bulacan (en)
location country
opening date
other designers
  • Manhattan Beach Studios (en)
owner
reason
  • Remove excessive citations (en)
start date
  • May 2017 (en)
status
  • Operational (en)
georss:point
  • 14.80713888888889 121.08680555555556
has abstract
  • The ABS-CBN Soundstage (Horizon IT Park) in San Jose del Monte, Bulacan, is the second headquarters and production facility of ABS-CBN. It is owned by ABS-CBN Corporation and it is operated and managed by ABS-CBN Studios, Inc. The production hub will also include back lots, production and post-production facilities and offices. It is a part of ABS-CBN's Horizon IT Park which sits on 7.7 hectares of land in San Jose del Monte Bulacan. As of 2018, it has 2 stages in one soundstage, the first stage is the EL3 Stage, which is named after Eugenio Lopez III. The other soundstage, which includes Stage 3 & 4 are still under construction. It is used by ABS-CBN Films and ABS-CBN Entertainment. The park is planned to have 10 soundstages which consists of 20 stages each. The area also includes parking spaces, storage, visitors center, offices and other facilities, The cost of the project is estimated to be ₱ 6 to 7.5 billion. (en)
grounds area
rooms
prov:wasDerivedFrom
page length (characters) of wiki page
alternative name
  • Horizon IT Park (en)
building start date
  • May 2017 (Phase 1A, the second soundstage is still under construction)
floor count
height (μ)
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software