Badgingarra Wind Farm is a wind farm in the locality of northwest of the town of Badgingarra in Western Australia, about 200 kilometres (120 mi) north of Perth. It is owned by APA Group and located immediately north of the older Emu Downs Wind Farm which has the same owner. Badgingarra Wind Farm was officially opened by the Western Australian Energy Minister, Bill Johnston on 2 May 2019. It is connected to the Western Power network North Country region. The output is contracted to Alinta Energy until the end of 2035. The wind farm is expected to generate 500–550 GWh of energy per annum.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
cost |
|
country |
|
location |
|
owner | |
status |
|
commissioned |
|
georss:point |
|
has abstract |
|
construction began |
|
ps units manu model |
|
ps units operational |
|
building start year |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
building start date |
|
opening date |
|
opening year |
|
status |
|
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is foaf:primaryTopic of |