Blackhillock Substation is an electrical substation located in the north east of Scotland, near the town of Keith in Moray. It is owned and operated by Scottish Southern Electricity Network (SSEN). Covering an area the size of 24 football pitches, it is as of January 2019, the UK's largest substation and Europe's second biggest.

AttributesValues
rdf:type
rdfs:label
  • Blackhillock Substation (en)
rdfs:comment
  • Blackhillock Substation is an electrical substation located in the north east of Scotland, near the town of Keith in Moray. It is owned and operated by Scottish Southern Electricity Network (SSEN). Covering an area the size of 24 football pitches, it is as of January 2019, the UK's largest substation and Europe's second biggest. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Electricity_sub_station_at_Blackhillock._-_geograph.org.uk_-_237061.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • 57.523 -2.948
has abstract
  • Blackhillock Substation is an electrical substation located in the north east of Scotland, near the town of Keith in Moray. It is owned and operated by Scottish Southern Electricity Network (SSEN). Covering an area the size of 24 football pitches, it is as of January 2019, the UK's largest substation and Europe's second biggest. Construction began in early 2015 to upgrade the existing substation so it could accommodate the new Caithness - Moray Link. The £1bn construction project had four main elements: 400kV and 132kV gas-insulated substations, one 275kV air-insulated substation, a High Voltage Direct Current (HVDC) converter for the Caithness - Moray subsea link and a HVDC underground cable from the substation to Portgordon. In January 2019 construction and commissioning were completed making it the UK's largest operating substation. It is seen as integral to the UK electricity grid as the north of Scotland generates much renewable energy via windfarms. The upgrade was primarily done to accommodate the Beatrice Windfarm. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-2.9479999542236 57.522998809814)
is Link from a Wikipage to another Wikipage of
is finish of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 53 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software