The Caithness–Moray Link is a 160 km (100-mile) HVDC submarine power cable beneath the Moray Firth in Scotland, linking Spittal in Caithness and Blackhillock in Moray. Constructed by Scottish & Southern Electricity Networks, it is capable of transmitting up to 1,200 MW of power. It was officially completed in January 2019, under budget at a cost of £970 million, and was reported as the largest single investment in the northern Scottish electricity network since the 1950s.

AttributesValues
rdfs:label
  • Caithness - Moray Link (en)
rdfs:comment
  • The Caithness–Moray Link is a 160 km (100-mile) HVDC submarine power cable beneath the Moray Firth in Scotland, linking Spittal in Caithness and Blackhillock in Moray. Constructed by Scottish & Southern Electricity Networks, it is capable of transmitting up to 1,200 MW of power. It was officially completed in January 2019, under budget at a cost of £970 million, and was reported as the largest single investment in the northern Scottish electricity network since the 1950s. (en)
name
  • Caithness-Moray Link (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
substation installer
through
dbp:wikiPageUsesTemplate
capacity
construction cost
country
length km
operator
start
  • Spittal substation, Caithness (en)
type
  • submarine cable (en)
finish
has abstract
  • The Caithness–Moray Link is a 160 km (100-mile) HVDC submarine power cable beneath the Moray Firth in Scotland, linking Spittal in Caithness and Blackhillock in Moray. Constructed by Scottish & Southern Electricity Networks, it is capable of transmitting up to 1,200 MW of power. It was officially completed in January 2019, under budget at a cost of £970 million, and was reported as the largest single investment in the northern Scottish electricity network since the 1950s. The link was constructed to improve the connectivity of the Scottish electricity transmission network, and allow increased flow of electricity from renewable energy sources in the north of Scotland, such as the Beatrice and Dorenell wind farms. It is the second HVDC link to be constructed within the National Grid (as opposed to as an interconnector), after the Western HVDC Link. (en)
cable installer
circuits no
current type
DC voltage
est
  • January 2019 (en)
poles no
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 52 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software