About: Collgar Wind Farm     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCollgar_Wind_Farm&invfp=IFP_OFF&sas=SAME_AS_OFF&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia. It is operated by Collgar Renewables. With 111 wind turbines, and a total installed capacity of 222 MW registered with AEMO, it is Western Australia's largest wind farm. It became fully operational in October 2011 and is expected to generate 750 GWh per year on average over the 30-year life of the project.

AttributesValues
rdf:type
rdfs:label
  • Collgar Wind Farm (en)
rdfs:comment
  • Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia. It is operated by Collgar Renewables. With 111 wind turbines, and a total installed capacity of 222 MW registered with AEMO, it is Western Australia's largest wind farm. It became fully operational in October 2011 and is expected to generate 750 GWh per year on average over the 30-year life of the project. (en)
foaf:name
  • Collgar Wind Farm (en)
foaf:homepage
name
  • Collgar Wind Farm (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Collgar_wind_farm_01.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
wind farm type
  • Onshore (en)
dbp:wikiPageUsesTemplate
thumbnail
cost
country
  • Australia (en)
image caption
  • Collgar Wind Farm in 2019 (en)
location
  • Near Merredin (en)
owner
status
  • O (en)
website
  • [www.collgarwindfarm.com.au] (en)
has abstract
  • Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia. It is operated by Collgar Renewables. With 111 wind turbines, and a total installed capacity of 222 MW registered with AEMO, it is Western Australia's largest wind farm. It became fully operational in October 2011 and is expected to generate 750 GWh per year on average over the 30-year life of the project. (en)
construction began
  • June 2010 (en)
location map caption
  • Collgar Wind Farm in Australia (en)
ps annual generation
ps electrical cap fac
ps electrical capacity
ps units manu model
ps units operational
gold:hypernym
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • June 2010
status
  • O
average annual gro...er generation (J)
owner
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software