The Gold Coast railway line is an interurban railway line operated by Queensland Rail in Queensland, Australia, connecting Brisbane with the Gold Coast. The line currently includes stops at 17 stations. In 2021, a journey from Central station to the terminus of this line is scheduled to take 1 hour 23 minutes. Several new stations along the existing line and an extension south are planned.