The Juneau County Courthouse, located at 220 E. State St. in Mauston, Wisconsin, was built with Works Project Administration assistance. It was listed on the National Register of Historic Places in 1982. It was designed in Moderne style by architects Hougen & Henderson. A foundation stone indicates the year 1939; it was completed in 1941. It is a three-story building built on a raised basement, with setbacks as it rises, and is 164 by 70 feet (50 m × 21 m)in plan at its base.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Juneau County Courthouse (en)
|
rdfs:comment
| - The Juneau County Courthouse, located at 220 E. State St. in Mauston, Wisconsin, was built with Works Project Administration assistance. It was listed on the National Register of Historic Places in 1982. It was designed in Moderne style by architects Hougen & Henderson. A foundation stone indicates the year 1939; it was completed in 1941. It is a three-story building built on a raised basement, with setbacks as it rises, and is 164 by 70 feet (50 m × 21 m)in plan at its base. (en)
|
foaf:name
| - (en)
- Juneau County Courthouse (en)
|
name
| - Juneau County Courthouse (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
mpsub
| |
added
| |
architect
| |
architecture
| |
built
| |
location
| |
locmapin
| |
refnum
| |
georss:point
| |
has abstract
| - The Juneau County Courthouse, located at 220 E. State St. in Mauston, Wisconsin, was built with Works Project Administration assistance. It was listed on the National Register of Historic Places in 1982. It was designed in Moderne style by architects Hougen & Henderson. A foundation stone indicates the year 1939; it was completed in 1941. It is a three-story building built on a raised basement, with setbacks as it rises, and is 164 by 70 feet (50 m × 21 m)in plan at its base. It was built in two stages: first an "addition" started in 1938 to a pre-existing courthouse, then a second unit built over the razed pre-existing building. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
area (m2)
| |
NRHP Reference Number
| |
year of construction
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-90.07527923584 43.796390533447)
|
is Link from a Wikipage to another Wikipage
of | |
is ex image cap
of | |
is foaf:primaryTopic
of | |