The North Hollywood–Pasadena Transit Corridor is a proposed 18-mile (29 km) bus rapid transit line in the Metro Busway network in Los Angeles, California. It is planned to operate between Pasadena and the North Hollywood Metro Station in the San Fernando Valley where it will connect with the Metro B Line on the Metro Rail system and the G Line Metro Busway. The project completed its scoping phase in 2019, was approved by the Metro board on April 28, 2022 and is estimated to be completed by 2024. It is part of Metro's Twenty-eight by '28 initiative.