About: Indore-Dewas-Ujjain section     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/2DdBSbMUfF

The Indore-Dewas-Ujjain section of the Western Railway Zone is a partially operational public transit system in the state of Madhya Pradesh. It connects Indore Jn with Ujjain Jn on Ujjain-Bhopal section and Dewas Jn on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling. The tentative time of completion of the project is slated to be March 2023. The work is being done by Ratlam railway division of Western Railways.

AttributesValues
rdf:type
rdfs:label
  • Indore-Dewas-Ujjain section (en)
rdfs:comment
  • The Indore-Dewas-Ujjain section of the Western Railway Zone is a partially operational public transit system in the state of Madhya Pradesh. It connects Indore Jn with Ujjain Jn on Ujjain-Bhopal section and Dewas Jn on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling. The tentative time of completion of the project is slated to be March 2023. The work is being done by Ratlam railway division of Western Railways. (en)
foaf:name
  • Indore-Dewas-Ujjain section (en)
name
  • Indore-Dewas-Ujjain section (en)
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
gauge
  • broad gauge (en)
electrification
  • Yes (en)
locale
map state
  • collapsed (en)
operator
owner
status
  • Partially Operational (en)
system
Tracks
has abstract
  • The Indore-Dewas-Ujjain section of the Western Railway Zone is a partially operational public transit system in the state of Madhya Pradesh. It connects Indore Jn with Ujjain Jn on Ujjain-Bhopal section and Dewas Jn on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling. The tentative time of completion of the project is slated to be March 2023. The work is being done by Ratlam railway division of Western Railways. (en)
speed limit (kmh)
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Partially Operational
track length (μ)
is part of
operator
owner
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is line of
is serving railway line of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software