About: Ruby Junction/East 197th Avenue station     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Station, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/7taagZM2ET

Ruby Junction/East 197th Avenue is a MAX light rail station in Gresham, Oregon. It serves the Blue Line and is the 22nd stop eastbound on the eastside MAX line. The station is at the intersection of SE 197th Avenue and Burnside Street. The station was located in TriMet fare zone 4 from its opening in 1986 until September 1988, and in zone 3 from then until September 2012, at which time TriMet discontinued all use of zones in its fare structure.

AttributesValues
rdf:type
rdfs:label
  • Ruby Junction/East 197th Avenue station (en)
rdfs:comment
  • Ruby Junction/East 197th Avenue is a MAX light rail station in Gresham, Oregon. It serves the Blue Line and is the 22nd stop eastbound on the eastside MAX line. The station is at the intersection of SE 197th Avenue and Burnside Street. The station was located in TriMet fare zone 4 from its opening in 1986 until September 1988, and in zone 3 from then until September 2012, at which time TriMet discontinued all use of zones in its fare structure. (en)
foaf:name
  • (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Ruby_Junction_East_197_Avenue_MAX_Station.jpg
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
ADA
  • yes (en)
address
bicycle
  • bike racks (en)
country
  • USA (en)
opened
owned
platform
Tracks
type
  • MAX Light Rail station (en)
georss:point
  • 45.516058 -122.460177
has abstract
  • Ruby Junction/East 197th Avenue is a MAX light rail station in Gresham, Oregon. It serves the Blue Line and is the 22nd stop eastbound on the eastside MAX line. The station is at the intersection of SE 197th Avenue and Burnside Street. The station's namesake, Ruby Junction, was a junction of electric interurban lines located immediately east of this location for many years and the name of an interurban stop. With the abandonment of the interurban lines west along Burnside Street to Montavilla and north to Troutdale, in 1927, it ceased being a junction, but interurban cars running between Portland and Bull Run (later cut back to Gresham) continued to pass through the area until the 1940s, and the location was still referred to as Ruby Junction. The station serves the Ruby Junction Maintenance and Operations Facility—often the point where MAX operators switch shifts or trains returning to the yards terminate, according to their rollsigns. Construction of that facility, which was also the first construction on TriMet's MAX system, began in March 1982, and the facility opened in mid-1983. It has been expanded several times since then. The station was located in TriMet fare zone 4 from its opening in 1986 until September 1988, and in zone 3 from then until September 2012, at which time TriMet discontinued all use of zones in its fare structure. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
address
  • (en)
  • SE Burnside St & 197th Ave (en)
  • Gresham,Oregon (en)
bicycle information
  • bike racks
is handicapped accessible
number of tracks
opening date
opening year
railway platforms
  • 2side platforms
owner
owning organisation
type
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-122.46017456055 45.516059875488)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software