About: S3 (Rhine-Ruhr S-Bahn)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Station, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/7t6eiieNo2

Line S3 is a S-Bahn in the Rhein-Ruhr network. It runs from Oberhausen over Essen to Hattingen Mitte. It is operated at 30-minute intervals, using Stadler FLIRT 3XL units. Line S 3 mainly runs over three lines built or acquired by the Bergisch-Märkische Railway Company: Its last 1.2 km to Hattingen Mitte runs over the opened by the Prussian state railways in 1884 and a short section of line opened by Deutsche Bundesbahn in 1987, including a 100 metre long tunnel.

AttributesValues
rdf:type
rdfs:label
  • S3 (Rhine-Ruhr S-Bahn) (en)
rdfs:comment
  • Line S3 is a S-Bahn in the Rhein-Ruhr network. It runs from Oberhausen over Essen to Hattingen Mitte. It is operated at 30-minute intervals, using Stadler FLIRT 3XL units. Line S 3 mainly runs over three lines built or acquired by the Bergisch-Märkische Railway Company: Its last 1.2 km to Hattingen Mitte runs over the opened by the Prussian state railways in 1884 and a short section of line opened by Deutsche Bundesbahn in 1987, including a 100 metre long tunnel. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/BF_Hattingen-Mitte_01.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
title color
  • black (en)
dbp:wikiPageUsesTemplate
thumbnail
Footnote
  • Source: German railway atlas (en)
title bg
  • Yellow (en)
title
  • Route of S3 (en)
has abstract
  • Line S3 is a S-Bahn in the Rhein-Ruhr network. It runs from Oberhausen over Essen to Hattingen Mitte. It is operated at 30-minute intervals, using Stadler FLIRT 3XL units. Line S 3 mainly runs over three lines built or acquired by the Bergisch-Märkische Railway Company: * from Oberhausen Hauptbahnhof to Essen-Steele Ost over the Witten/Dortmund–Oberhausen/Duisburg railway, opened in 1862, * from Essen-Steele Ost to Bochum-Dahlhausen over the Essen-Überruhr–Bochum-Langendreer railway, which was a former coal railway that was converted to standard gauge in 1865 and taken over by the Bergisch-Märkische Railway in 1870, * from Bochum-Dahlhausen to Hattingen over the Ruhr Valley Railway, opened in 1869. Its last 1.2 km to Hattingen Mitte runs over the opened by the Prussian state railways in 1884 and a short section of line opened by Deutsche Bundesbahn in 1987, including a 100 metre long tunnel. S-Bahn services commenced between Oberhausen and Hattingen on 26 May 1974. Services were extended from Hattingen to Hattingen Mitte on 3 July 1987. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is serving railway line of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software