The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Wyandot Solar Facility (en)
|
rdfs:comment
| - The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio. (en)
|
foaf:name
| - Wyandot Solar Facility (en)
|
name
| - Wyandot Solar Facility (en)
|
geo:lat
| |
geo:long
| |
location
| |
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
solar type
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
status
| |
commissioned
| |
georss:point
| - 40.88027777777778 -83.31583333333333
|
has abstract
| - The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio. On August 24, 2010, Ohio Governor Ted Strickland joined The Public Service Enterprise Group, Ohio State University President Dr. E. Gordon Gee, and other local leaders to open the solar facility. (en)
|
construction began
| |
location map caption
| - Location of the Wyandot Solar Facility in Ohio (en)
|
ps electrical capacity
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
opening year
| |
status
| |
installed capacity (W)
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-83.31583404541 40.880279541016)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |