About: 2010 Iceland power outages     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2F2010_Iceland_power_outages&invfp=IFP_OFF&sas=SAME_AS_OFF

The 2010 Iceland power outages was a massive, widespread power outage that occurred nationwide in Iceland, on Wednesday, September 1 to 21, 2010, at approximately 21:00 UTC. At the time, it was one of the most widespread electrical outages in Icelandic history. The three largest aluminium smelters in Iceland were hit by the outage, leaving Century Aluminum Grundartangi and Rio Tinto Alcan Straumsvík totally off-grid. The third aluminium smelter, Alcoa Fjarðarál, was forced to reduce its operations to a bare minimum. Hot water became immediately scarce in some of the neighborhoods in Reykjavík, the capital, 20 days fully restored.

AttributesValues
rdfs:label
  • 2010 Iceland power outages (en)
rdfs:comment
  • The 2010 Iceland power outages was a massive, widespread power outage that occurred nationwide in Iceland, on Wednesday, September 1 to 21, 2010, at approximately 21:00 UTC. At the time, it was one of the most widespread electrical outages in Icelandic history. The three largest aluminium smelters in Iceland were hit by the outage, leaving Century Aluminum Grundartangi and Rio Tinto Alcan Straumsvík totally off-grid. The third aluminium smelter, Alcoa Fjarðarál, was forced to reduce its operations to a bare minimum. Hot water became immediately scarce in some of the neighborhoods in Reykjavík, the capital, 20 days fully restored. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The 2010 Iceland power outages was a massive, widespread power outage that occurred nationwide in Iceland, on Wednesday, September 1 to 21, 2010, at approximately 21:00 UTC. At the time, it was one of the most widespread electrical outages in Icelandic history. The three largest aluminium smelters in Iceland were hit by the outage, leaving Century Aluminum Grundartangi and Rio Tinto Alcan Straumsvík totally off-grid. The third aluminium smelter, Alcoa Fjarðarál, was forced to reduce its operations to a bare minimum. Hot water became immediately scarce in some of the neighborhoods in Reykjavík, the capital, 20 days fully restored. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software