About: Airport Parkway (Mississippi)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Band, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FAirport_Parkway_%28Mississippi%29&invfp=IFP_OFF&sas=SAME_AS_OFF

The Airport Parkway is a proposed major highway development project in the Jackson, Mississippi, metropolitan area planned to connect Interstate 55 on the west, High Street in downtown Jackson, Mississippi Highway 25 (Lakeland Drive), and Mississippi Highway 475 (Airport Road) in Flowood at Jackson-Evers International Airport in the east. Approved in 2008, no construction has commenced as of 2022. The 12-mile (19 km) project includes a new crossing of the Pearl River. The entire road is planned to be operated as a toll road. Once complete, it will be signed as Interstate 755.

AttributesValues
rdf:type
rdfs:label
  • Airport Parkway (Mississippi) (en)
rdfs:comment
  • The Airport Parkway is a proposed major highway development project in the Jackson, Mississippi, metropolitan area planned to connect Interstate 55 on the west, High Street in downtown Jackson, Mississippi Highway 25 (Lakeland Drive), and Mississippi Highway 475 (Airport Road) in Flowood at Jackson-Evers International Airport in the east. Approved in 2008, no construction has commenced as of 2022. The 12-mile (19 km) project includes a new crossing of the Pearl River. The entire road is planned to be operated as a toll road. Once complete, it will be signed as Interstate 755. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Airport Parkway is a proposed major highway development project in the Jackson, Mississippi, metropolitan area planned to connect Interstate 55 on the west, High Street in downtown Jackson, Mississippi Highway 25 (Lakeland Drive), and Mississippi Highway 475 (Airport Road) in Flowood at Jackson-Evers International Airport in the east. Approved in 2008, no construction has commenced as of 2022. The 12-mile (19 km) project includes a new crossing of the Pearl River. The entire road is planned to be operated as a toll road. Once complete, it will be signed as Interstate 755. The Airport Parkway Commission that was formed in 1995 to help advance the project consists of the mayors of Pearl, Flowood, and Jackson, the three cities through which the Airport Parkway would run. The U.S. Congress allocated $35 million for the project. The environmental impact statement was completed in 1999. Right-of-way acquisition for the portion of the project in Rankin County (about 40% of the total right-of-way requirement) was completed at a cost of $15 million. As of December 2007, the total cost to complete the project was estimated at about $400 million. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 63 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software