About: Alderton Tunnel     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailwayTunnelsInEngland, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FAlderton_Tunnel&invfp=IFP_OFF&sas=SAME_AS_OFF

The Alderton Tunnel sits on the South Wales Main Line in England, on a stretch of line between Swindon and Bristol Parkway. The tunnel, which is 506 yards (463 m (1,519 ft)) long, was opened on 1 January 1903 along with the line between Wootton Bassett Junction and Badminton, that being the first section of the South Wales & Bristol Direct Line of the Great Western Railway. Building of the tunnel commenced at least two years before 1903, as the rise in railway workers boarding in Alderton village can be seen in the 1901 Census.

AttributesValues
rdf:type
rdfs:label
  • Alderton Tunnel (en)
rdfs:comment
  • The Alderton Tunnel sits on the South Wales Main Line in England, on a stretch of line between Swindon and Bristol Parkway. The tunnel, which is 506 yards (463 m (1,519 ft)) long, was opened on 1 January 1903 along with the line between Wootton Bassett Junction and Badminton, that being the first section of the South Wales & Bristol Direct Line of the Great Western Railway. Building of the tunnel commenced at least two years before 1903, as the rise in railway workers boarding in Alderton village can be seen in the 1901 Census. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 51.541666666666664 -2.2219444444444445
has abstract
  • The Alderton Tunnel sits on the South Wales Main Line in England, on a stretch of line between Swindon and Bristol Parkway. The tunnel, which is 506 yards (463 m (1,519 ft)) long, was opened on 1 January 1903 along with the line between Wootton Bassett Junction and Badminton, that being the first section of the South Wales & Bristol Direct Line of the Great Western Railway. Building of the tunnel commenced at least two years before 1903, as the rise in railway workers boarding in Alderton village can be seen in the 1901 Census. As part of the modernisation of the Great Western main line, the route through the tunnel closed from 19 August to 15 September 2017 to allow overhead electrification equipment to be fitted. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-2.2219443321228 51.541667938232)
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 62 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software