The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre is owned and operated by TransAlta and at the time of opening, was Canada's largest wind energy installation. Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
thumbnail | |
country |
|
image caption |
|
location |
|
operator | |
owner | |
status |
|
commissioned |
|
georss:point |
|
has abstract |
|
construction began |
|
ps electrical capacity |
|
gold:hypernym | |
building start year |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
building start date |
|
opening date |
|
opening year |
|
status |
|
installed capacity (W) |
|
operator | |
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |