The Babadag Wind Farm (also referred as Renewable Energy Production Facilities in Babadag; Romanian: Parc Eolian Babadag) is a wind farm in Babadag, Tulcea County, Romania. The wind farm is owned and operated by Eviva Nalbant, a subsidiary of Portuguese multinational company Martifer. The project was developed as a joint implementation project. The wind park was financed with €23 million loan from Banca Comercială Română.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - The Babadag Wind Farm (also referred as Renewable Energy Production Facilities in Babadag; Romanian: Parc Eolian Babadag) is a wind farm in Babadag, Tulcea County, Romania. The wind farm is owned and operated by Eviva Nalbant, a subsidiary of Portuguese multinational company Martifer. The project was developed as a joint implementation project. The wind park was financed with €23 million loan from Banca Comercială Română. (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
wind farm type
| |
dbp:wikiPageUsesTemplate
| |
cost
| |
country
| |
location
| |
operator
| |
owner
| |
status
| |
commissioned
| |
georss:point
| - 44.901666666666664 28.689722222222223
|
has abstract
| - The Babadag Wind Farm (also referred as Renewable Energy Production Facilities in Babadag; Romanian: Parc Eolian Babadag) is a wind farm in Babadag, Tulcea County, Romania. The wind farm is owned and operated by Eviva Nalbant, a subsidiary of Portuguese multinational company Martifer. The project was developed as a joint implementation project. The wind park was financed with €23 million loan from Banca Comercială Română. The project started in 2007 when Eviva Nalbant conducted a preliminary wind resource assessment and pre-feasibility assessment. The concession contract with Babadag Municipality was signed in September 2007. In 2008, a turbine supply contract was signed with Suzlon Energy. In April 2009, the project was revised and optimized based on on-site measurement data. A construction permit was issued in March 2010 and construction started in April 2010. The wind farm is located on 260 hectares (640 acres). It contains two locations: Babadag I (16 turbines) and Babadag II (four turbines). Originally, the project was to include 48 wind turbines with a nominal capacity 1 MW each. However, the project was delayed and it was later change to have 20 Suzlon S88 turbines with a nameplate capacity of 2.1 MW each. The hub-height is 79 metres (259 ft) and the rotor diameter is 88 metres (289 ft). (en)
|
construction began
| |
name official
| |
ps electrical capacity
| |
ps units manu model
| - Suzlon Energy: Suzlon S88 (en)
|
ps units operational
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
opening year
| |
status
| |
installed capacity (W)
| |
country
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(28.689722061157 44.901668548584)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |