Brandon Generating Station is a natural gas-fired power station owned by Manitoba Hydro, located in Brandon, Manitoba, Canada. The station was first built to burn lignite from Saskatchewan. On 1 January 2010, Unit 5, the sole coal-fired unit, was downgraded to emergency use only, per section 16 of the Manitoba Climate Change and Emissions Reductions Act. Unit 5 was permitted to operate as a generator only under certain circumstances:
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Brandon Generating Station (en)
|
rdfs:comment
| - Brandon Generating Station is a natural gas-fired power station owned by Manitoba Hydro, located in Brandon, Manitoba, Canada. The station was first built to burn lignite from Saskatchewan. On 1 January 2010, Unit 5, the sole coal-fired unit, was downgraded to emergency use only, per section 16 of the Manitoba Climate Change and Emissions Reductions Act. Unit 5 was permitted to operate as a generator only under certain circumstances: (en)
|
foaf:name
| - Brandon Generating Station (en)
|
name
| - Brandon Generating Station (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
th fuel primary
| |
th technology
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
image caption
| - Natural-gas fired combustion turbine building at Brandon GS (en)
|
location
| |
owner
| |
status
| |
commissioned
| |
georss:point
| - 49.84527777777778 -99.88916666666667
|
has abstract
| - Brandon Generating Station is a natural gas-fired power station owned by Manitoba Hydro, located in Brandon, Manitoba, Canada. The station was first built to burn lignite from Saskatchewan. On 1 January 2010, Unit 5, the sole coal-fired unit, was downgraded to emergency use only, per section 16 of the Manitoba Climate Change and Emissions Reductions Act. Unit 5 was permitted to operate as a generator only under certain circumstances:
* To prevent a situation which would lead to a disruption or destabilization of the power supply.
* In drought years where demand exceeds forecasted supply.
* To maintain the generator in a state of readiness and availability. The last allowance required Unit 5 to operate for 3–4 days each month at 10–15% of maximum capacity. Unit 5 stopped burning coal on August 1, 2018, and was converted to a synchronous condenser. (en)
|
ps electrical capacity
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening year
| |
status
| |
installed capacity (W)
| |