About: Bridgefoot Halt railway station     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Station, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBridgefoot_Halt_railway_station&invfp=IFP_OFF&sas=SAME_AS_OFF

Bridgefoot Halt railway station was opened in 1914. The halt was in the settlement of Bridgefoot close to the town of Banff. The line from Tillynaught opened in 1859 and a temporary terminus opened at Banff on 30 July 1859 and a permanent station opened in 1860. Bridgehouse Halt had a single platform and was opened by the GNoSR. The OS map of 1902 shows a 'Halt' at the site of the 1914 platform without indicating any structure at the site.

AttributesValues
rdf:type
rdfs:label
  • Bridgefoot Halt railway station (en)
rdfs:comment
  • Bridgefoot Halt railway station was opened in 1914. The halt was in the settlement of Bridgefoot close to the town of Banff. The line from Tillynaught opened in 1859 and a temporary terminus opened at Banff on 30 July 1859 and a permanent station opened in 1860. Bridgehouse Halt had a single platform and was opened by the GNoSR. The OS map of 1902 shows a 'Halt' at the site of the 1914 platform without indicating any structure at the site. (en)
foaf:name
  • Bridgefoot Halt (en)
name
  • Bridgefoot Halt (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
events
  • Closed to passengers (en)
  • Bridgefoot Halt present (en)
  • Line closed to all traffic (en)
  • Opened with a platform (en)
borough
country
  • Scotland (en)
grid name
next
  • Towards Banff (en)
platforms
previous
  • Towards Grange (en)
route
status
  • Disused (en)
years
georss:point
  • 57.668221 -2.555022
has abstract
  • Bridgefoot Halt railway station was opened in 1914. The halt was in the settlement of Bridgefoot close to the town of Banff. The line from Tillynaught opened in 1859 and a temporary terminus opened at Banff on 30 July 1859 and a permanent station opened in 1860. Bridgehouse Halt had a single platform and was opened by the GNoSR. The OS map of 1902 shows a 'Halt' at the site of the 1914 platform without indicating any structure at the site. The Great North of Scotland Railway (GNoSR) took over the line in 1867 and operated it until grouping in 1923. Passing into British Railways ownership in 1948, the line was, like the rest of the former GNoSR lines along the Moray coast, considered for closure as part of the Beeching report and closure notices were issued in 1963. Passenger services were withdrawn in July 1964 and the entire line finally closed to all traffic in 1968. (en)
postgroup
pregroup
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-2.5550220012665 57.66822052002)
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 50 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software