About: Bruce Freeman Rail Trail     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailTrailsInMassachusetts, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBruce_Freeman_Rail_Trail&invfp=IFP_OFF&sas=SAME_AS_OFF

The Bruce Freeman Rail Trail is a partially-completed rail trail in Massachusetts. The path is a 10-foot-wide (3.0 m) paved multi-use trail, available for walking, running, biking, rollerblading, and other non-motorized uses. It follows the right-of-way of the disused Framingham and Lowell Line of the New York, New Haven and Hartford Railroad. The constructed route connects with the Bay Circuit Trail, and Phase 2D will connect with the Mass Central Rail Trail. The total planned length of the trail—which will eventually run continuously between Lowell and Framingham—is just under 25 miles (40 km).

AttributesValues
rdf:type
rdfs:label
  • Bruce Freeman Rail Trail (en)
rdfs:comment
  • The Bruce Freeman Rail Trail is a partially-completed rail trail in Massachusetts. The path is a 10-foot-wide (3.0 m) paved multi-use trail, available for walking, running, biking, rollerblading, and other non-motorized uses. It follows the right-of-way of the disused Framingham and Lowell Line of the New York, New Haven and Hartford Railroad. The constructed route connects with the Bay Circuit Trail, and Phase 2D will connect with the Mass Central Rail Trail. The total planned length of the trail—which will eventually run continuously between Lowell and Framingham—is just under 25 miles (40 km). (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Bruce_Freeman_Rail_Trail,_South_Chelmsford_MA.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • The Bruce Freeman Rail Trail is a partially-completed rail trail in Massachusetts. The path is a 10-foot-wide (3.0 m) paved multi-use trail, available for walking, running, biking, rollerblading, and other non-motorized uses. It follows the right-of-way of the disused Framingham and Lowell Line of the New York, New Haven and Hartford Railroad. The constructed route connects with the Bay Circuit Trail, and Phase 2D will connect with the Mass Central Rail Trail. The total planned length of the trail—which will eventually run continuously between Lowell and Framingham—is just under 25 miles (40 km). The trail is divided into several phases of construction: * Phase 1: 6.8 miles (10.9 km) in Lowell (starting at Cross Point Towers), Chelmsford, and Westford (ending at Route 225). This segment opened on August 29, 2009. In 2019, the state awarded $180,000 for construction of a short connecting trail under the Lowell Connector. * Phase 2: * Phase 2A: 4.9 miles (7.9 km) through Westford, Carlisle, and Acton (Route 225) to just north of Route 2). This segment began construction in June 2015 and opened on April 3, 2018. * Phase 2B: 0.8 miles (1.3 km) in Acton and Concord, set to open in mid 2022 with a bridge spanning MA Route 2. * Phase 2C: 2.8 miles (4.5 km) from Commonwealth Avenue to Powder Mill Road in Concord, with a short discontinuity at West Concord station. This $7.2 million segment began construction in July 2017 and opened on September 27, 2019. An additional 0.6 miles (0.97 km) from Powder Mill Road to the Concord/Sudbury town line will be added later. * Phase 2D: 4.4 miles (7.1 km) in Sudbury from the town line to the Mass Central Rail Trail, with construction expected to begin in late 2022. * Phase 3: 4.8 miles (7.7 km) from the Mass Central Rail Trail to Route 9 in Framingham. This section of the right-of-way is still owned by CSX Transportation. In July 2020, the state awarded $300,000 to purchase the 1.4 miles (2.3 km) of right-of-way in Sudbury from the Mass Central Rail Trail to the Framingham line. Framingham and Sudbury were awarded $648,000 in state grants in 2022 to design Phase 3. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software