The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA). This storage hydropower plant is to be located on the Budhi Gandaki River, approximately 2 km upstream of its confluence with Trishuli River, about 55 km west of Kathmandu (80 km by road). With its planned installed capacity of 1,200 MW, it is the largest hydropower project in Nepal (before 900 MW Upper Karnali and Arun III projects), being sometimes considered a national pride. The 225 meters high dam will also be one of the highest in the country.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Budhigandaki Hydroelectric Project (en)
|
rdfs:comment
| - The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA). This storage hydropower plant is to be located on the Budhi Gandaki River, approximately 2 km upstream of its confluence with Trishuli River, about 55 km west of Kathmandu (80 km by road). With its planned installed capacity of 1,200 MW, it is the largest hydropower project in Nepal (before 900 MW Upper Karnali and Arun III projects), being sometimes considered a national pride. The 225 meters high dam will also be one of the highest in the country. (en)
|
foaf:name
| - Budhi Gandaki Hydropower project (en)
|
name
| - Budhi Gandaki Hydropower project (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
spillway capacity
| |
dbp:wikiPageUsesTemplate
| |
cost
| |
country
| |
location
| |
purpose
| |
status
| |
georss:point
| - 27.825555555555557 -84.77361111111111
|
has abstract
| - The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA). This storage hydropower plant is to be located on the Budhi Gandaki River, approximately 2 km upstream of its confluence with Trishuli River, about 55 km west of Kathmandu (80 km by road). With its planned installed capacity of 1,200 MW, it is the largest hydropower project in Nepal (before 900 MW Upper Karnali and Arun III projects), being sometimes considered a national pride. The 225 meters high dam will also be one of the highest in the country. Aside from the dam, a 225 km long ring road will be built all around the future reservoir, which may also serve as a tourist attraction. ≤≤≤≤≤== Timeline ==≥≥≥≥≥The site has been identified as early as in the late 1970s. A pre-feasibility study was carried out in 1984, and a first feasibility study in 1998. Additional studies conducted by the NEA in 2010–2011 in order to optimize hydropower potential use on the site led to the current proposal. As of May 2019, the resettlement process was ongoing, with Rs20 billion already spent in land acquisition in both concerned districts, and another Rs18 billion set aside to complete compensation by the next fiscal year. In the meanwhile, Finance Misistry started to raise concerns over the total cost of the project. In June 2019, the 635 MW was favoured by NEA to Budi Gandaki HPP, due to its lower social impact ("only" 162 households severely impacted), lower cost ($1.5 billion), slightly higher and substantially more steady power output, thanks to its feeding by Mount Everest snowmelt during the dry season. Conversely, Budhi Gandaki HPP, which used to be considered "top priority", was compromised by its massive cost and uncertainty related to population relocation. As a result, financing and construction of the latter might not occur during the next few years. As of November 2019, a total Rs 37 billion ($300 million) had been raised for the project, mostly via an infrastructure tax on petroleum products imports. This tax allows to collect an estimated Rs1billion per month. The government targets to achieve the compensation process by mid-July 2020. (en)
|
dam crosses
| |
dam height thalweg
| |
plant annual gen
| |
plant capacity
| |
plant hydraulic head
| |
plant type
| |
res capacity total
| |
res catchment
| |
res elevation
| |
res max length
| |
res surface
| |
vastest lake
| |
part
| |
river
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
purpose
| |
status
| |
country
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-84.773612976074 27.825555801392)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |