About: Burgos Wind Farm     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBurgos_Wind_Farm&invfp=IFP_OFF&sas=SAME_AS_OFF

Burgos Wind Farm is a wind farm in Burgos, Ilocos Norte, Philippines. It is the second wind farm built in the province of Ilocos Norte and the largest project of its kind in the Philippines. The estimated cost for the construction of the wind farm was US$450 million. The wind farm was commissioned on November 9, 2014, and upon its completion it became the largest wind farm in the country and in Southeast Asia, covering 600 hectares and three barangays of Burgos, namely Saoit, Poblacion, and Nagsurot. The project was the first one to be nominated by the Department of Energy as eligible for the department's feed-in tariff (FIT) scheme.

AttributesValues
rdf:type
rdfs:label
  • Burgos Wind Farm (en)
  • Windpark Burgos (de)
rdfs:comment
  • Der Windpark Burgos ist ein Windpark auf dem Gebiet der Stadtgemeinde Bangui, Provinz Ilocos Norte, Philippinen. Die installierte Leistung beträgt 150 MW. Damit ist Burgos mit Stand August 2022 der leistungsstärkste Windpark auf den Philippinen. (de)
  • Burgos Wind Farm is a wind farm in Burgos, Ilocos Norte, Philippines. It is the second wind farm built in the province of Ilocos Norte and the largest project of its kind in the Philippines. The estimated cost for the construction of the wind farm was US$450 million. The wind farm was commissioned on November 9, 2014, and upon its completion it became the largest wind farm in the country and in Southeast Asia, covering 600 hectares and three barangays of Burgos, namely Saoit, Poblacion, and Nagsurot. The project was the first one to be nominated by the Department of Energy as eligible for the department's feed-in tariff (FIT) scheme. (en)
foaf:name
  • Burgos Wind Farm (en)
name
  • Burgos Wind Farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Burgos_Wind_Mills.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
wind farm type
  • Onshore (en)
dbp:wikiPageUsesTemplate
thumbnail
cost
country
location
operator
owner
status
  • O (en)
commissioned
georss:point
  • 18.516111111111112 120.64611111111111
has abstract
  • Burgos Wind Farm is a wind farm in Burgos, Ilocos Norte, Philippines. It is the second wind farm built in the province of Ilocos Norte and the largest project of its kind in the Philippines. The estimated cost for the construction of the wind farm was US$450 million. The wind farm was commissioned on November 9, 2014, and upon its completion it became the largest wind farm in the country and in Southeast Asia, covering 600 hectares and three barangays of Burgos, namely Saoit, Poblacion, and Nagsurot. The project was the first one to be nominated by the Department of Energy as eligible for the department's feed-in tariff (FIT) scheme. Under the , the Philippine can "(guarantee) fixed rate per kilowatt-hour – the FIT rates – for power producers harnessing renewable energy under the FIT system." In February 2015, the ERC agreed to give a FIT rate of P8.53 per kilowatt hour for 20 years to the Burgos Wind Farm of the Energy Development Corporation. (en)
  • Der Windpark Burgos ist ein Windpark auf dem Gebiet der Stadtgemeinde Bangui, Provinz Ilocos Norte, Philippinen. Die installierte Leistung beträgt 150 MW. Damit ist Burgos mit Stand August 2022 der leistungsstärkste Windpark auf den Philippinen. Mit den Bauvorbereitungen wurde im April 2013 begonnen; die Bauarbeiten für den ersten Abschnitt begannen im Juni 2013. Der Windpark ging im November 2014 in Betrieb. Die geplante Laufzeit der Generatoren liegt bei 20 Jahren. Die jährliche Erzeugung wird mit 370 GWh angegeben. Die erzeugte elektrische Energie wird über eine 43 km lange, einfache Freileitung, welche mit 115 kV betrieben wird, zum Umspannwerk der National Grid Corporation of the Philippines (NGCP) in Laoag City geführt. (de)
construction began
ps annual generation
ps electrical capacity
ps units manu model
  • Vestas V90-3MW (en)
ps units operational
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • April 19, 2013
opening date
opening year
status
  • O
average annual gro...er generation (J)
installed capacity (W)
country
operator
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(120.64611053467 18.516111373901)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software