About: Capivara Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCapivara_Dam&invfp=IFP_OFF&sas=SAME_AS_OFF

The Capivara Dam is an embankment dam on the Paranapanema River about 10 kilometres (6.2 mi) north of Porecatu, PR in Brazil. It is located along the border of the state of São Paulo to the north and the state of Paraná to the south. It was constructed between 1971 and 1978 for the primary purpose of hydroelectric power generation. The dam's first generator was commissioned in 1977. The dam can store up to 10,540,000,000 cubic metres (8,540,000 acre⋅ft) in its reservoir which also covers and area of 515 square kilometres (199 sq mi). It is operated by Duke Energy Generation Paranapanema International.

AttributesValues
rdf:type
rdfs:label
  • Capivara Dam (en)
  • Kraftwerk Capivara (de)
  • Represa de Capivara (es)
  • Usina Hidrelétrica de Capivara (pt)
  • ГЕС Капівара (uk)
rdfs:comment
  • Das Kraftwerk Capivara (portugiesisch Usina Hidrelétrica de Capivara bzw. UHE Capivara) ist ein Wasserkraftwerk in Brasilien, das den Paranapanema zum Capivara-Stausee (port. Reservatório bzw. Represa Capivara) aufstaut. Der Paranapanema bildet hier die Grenze zwischen den Gemeinden , São Paulo und Porecatu, Paraná. Mit dem Bau des Kraftwerks wurde 1971 begonnen. Es wurde 1977 in Betrieb genommen. Das Kraftwerk ist im Besitz von Duke Energy International Geração Paranapanema und wird auch von Duke Energy betrieben. (de)
  • The Capivara Dam is an embankment dam on the Paranapanema River about 10 kilometres (6.2 mi) north of Porecatu, PR in Brazil. It is located along the border of the state of São Paulo to the north and the state of Paraná to the south. It was constructed between 1971 and 1978 for the primary purpose of hydroelectric power generation. The dam's first generator was commissioned in 1977. The dam can store up to 10,540,000,000 cubic metres (8,540,000 acre⋅ft) in its reservoir which also covers and area of 515 square kilometres (199 sq mi). It is operated by Duke Energy Generation Paranapanema International. (en)
  • A Usina Hidrelétrica de Capivara localiza-se no Rio Paranapanema na região de , entre os municípios de Porecatu no estado do Paraná, e Taciba no estado de São Paulo. (pt)
  • La represa Escola de Engenharia Mackenzie o Capivara, está situada sobre el río Paranapanema, entre los municipios de , estado de São Paulo e , estado de Paraná, Brasil. La presa fue inaugurada en 1978 y es la mayor entre las que se encuentran sobre el Paranapanema. Posee una extensión de 1.500 metros de longitud y 60 metros de altura. En la misma se alojan 4 turbinas tipo Francis con una potencia total instalada de 619 MW y su embalse ocupa 576 km². (es)
  • ГЕС Капівара (порт. Usina Hidrelétrica de Capivara) — гідроелектростанція на сході Бразилії на межі штатів Сан-Паулу та Парана. Розташована між ГЕС Каноас I (вище по течії) та ГЕС Такуарусу, входить до складу каскаду на річці Паранапанема, лівій притоці Парани. Від сховища через греблю прокладено чотири тунелі діаметром по 11 метрів та довжиною по 147 метрів, які подають воду до встановлених у машинному залі чотирьох турбін типу Френсіс потужністю по 160 МВт, що працюють при напорі у 50 метрів. Видача продукції здійснюється по ЛЕП, розрахованій на роботу під напругою 460 кВ. (uk)
foaf:name
  • Capivara Dam (en)
  • Usina Hidrelétrica de Capivara (en)
name
  • Capivara Dam (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Vertedouro.UHECapivara.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
spillway type
  • Gate-controlled (en)
dbp:wikiPageUsesTemplate
thumbnail
country
  • Brazil (en)
image caption
  • Spillway of the Capivara Dam (en)
location
location map
  • Brazil (en)
opening
owner
purpose
  • Power (en)
status
  • O (en)
georss:point
  • -22.660091666666666 -51.357977777777776
has abstract
  • Das Kraftwerk Capivara (portugiesisch Usina Hidrelétrica de Capivara bzw. UHE Capivara) ist ein Wasserkraftwerk in Brasilien, das den Paranapanema zum Capivara-Stausee (port. Reservatório bzw. Represa Capivara) aufstaut. Der Paranapanema bildet hier die Grenze zwischen den Gemeinden , São Paulo und Porecatu, Paraná. Mit dem Bau des Kraftwerks wurde 1971 begonnen. Es wurde 1977 in Betrieb genommen. Das Kraftwerk ist im Besitz von Duke Energy International Geração Paranapanema und wird auch von Duke Energy betrieben. (de)
  • The Capivara Dam is an embankment dam on the Paranapanema River about 10 kilometres (6.2 mi) north of Porecatu, PR in Brazil. It is located along the border of the state of São Paulo to the north and the state of Paraná to the south. It was constructed between 1971 and 1978 for the primary purpose of hydroelectric power generation. The dam's first generator was commissioned in 1977. The dam can store up to 10,540,000,000 cubic metres (8,540,000 acre⋅ft) in its reservoir which also covers and area of 515 square kilometres (199 sq mi). It is operated by Duke Energy Generation Paranapanema International. (en)
  • La represa Escola de Engenharia Mackenzie o Capivara, está situada sobre el río Paranapanema, entre los municipios de , estado de São Paulo e , estado de Paraná, Brasil. La presa fue inaugurada en 1978 y es la mayor entre las que se encuentran sobre el Paranapanema. Posee una extensión de 1.500 metros de longitud y 60 metros de altura. En la misma se alojan 4 turbinas tipo Francis con una potencia total instalada de 619 MW y su embalse ocupa 576 km². Construida por la Companhia Energética de São Paulo (CESP) durante a década de 1970, actualmente está concesionada a la compañía Duke Energy International Geração Paranapanema. (es)
  • A Usina Hidrelétrica de Capivara localiza-se no Rio Paranapanema na região de , entre os municípios de Porecatu no estado do Paraná, e Taciba no estado de São Paulo. (pt)
  • ГЕС Капівара (порт. Usina Hidrelétrica de Capivara) — гідроелектростанція на сході Бразилії на межі штатів Сан-Паулу та Парана. Розташована між ГЕС Каноас I (вище по течії) та ГЕС Такуарусу, входить до складу каскаду на річці Паранапанема, лівій притоці Парани. У межах проекту Паранапанему перекрили земляною греблею з бетонними елементами висотою 59 метрів та довжиною 1500 метрів, на яку витратили 7,3 млн м3 ґрунту та 680 тис. м3 бетону. Ця споруда утримує велике водосховище з площею поверхні 576 км2 та об'ємом 11,7 млрд м3 (корисний об'єм 5,7 млрд м3), в якому можливе операційне коливання рівня поверхні між позначками 321 та 334 метри НРМ (максимальний рівень на випадок повені 336 метрів НРМ, а площа при цьому збільшується до 610 км2). Від сховища через греблю прокладено чотири тунелі діаметром по 11 метрів та довжиною по 147 метрів, які подають воду до встановлених у машинному залі чотирьох турбін типу Френсіс потужністю по 160 МВт, що працюють при напорі у 50 метрів. Видача продукції здійснюється по ЛЕП, розрахованій на роботу під напругою 460 кВ. (uk)
construction began
dam crosses
dam type
  • Embankment (en)
name official
  • Usina Hidrelétrica de Capivara (en)
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software