About: Chirundu-Beitbridge Regional Road Corridor     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : geo:SpatialThing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FChirundu-Beitbridge_Regional_Road_Corridor&invfp=IFP_OFF&sas=SAME_AS_OFF

Chirundu–Beitbridge Road Corridor is a Trans-African Highway Network Zimbabwean link between South Africa and Zambia. It is part of the North–South Corridor Project and forms the entire Zimbabwean section of the Cape to Cairo Road. The local road corridor has two legs; the Chirundu–Harare and the Harare–Beitbridge highways.

AttributesValues
rdf:type
rdfs:label
  • Chirundu-Beitbridge Regional Road Corridor (en)
rdfs:comment
  • Chirundu–Beitbridge Road Corridor is a Trans-African Highway Network Zimbabwean link between South Africa and Zambia. It is part of the North–South Corridor Project and forms the entire Zimbabwean section of the Cape to Cairo Road. The local road corridor has two legs; the Chirundu–Harare and the Harare–Beitbridge highways. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Chirundu-Beitbridge_Highway.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • -16.04187 28.86148
has abstract
  • Chirundu–Beitbridge Road Corridor is a Trans-African Highway Network Zimbabwean link between South Africa and Zambia. It is part of the North–South Corridor Project and forms the entire Zimbabwean section of the Cape to Cairo Road. The North-South Multimodal Transport Corridor is under the African Union PIDA. The Programme for Infrastructure Development in Africa (PIDA) is an all-Africa program to develop a vision, policies and strategies for development of priority trans-regional and continental infrastructure, which includes transport; hence the rehabilitation of regional road corridors. The African Development Bank being the Executing Agency for the Programme. The local road corridor has two legs; the Chirundu–Harare and the Harare–Beitbridge highways. The road has been divided into sections described here as "links" and the rehabilitation of the highway is being carried out in various "links" which would eventually see the whole route done. The links are numbered from north to south; from Chirundu border with Zambia to Beitbridge border with South Africa. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(28.861480712891 -16.041870117188)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software