Cleve Hill solar farm is a photovoltaic power station that was approved 28 May 2020. It is sited on the Graveney marshes between Faversham and Whitstable, Kent in the UK. It will generate 350MW of electricity from 900 acres (360 ha) vertical solar panels and will feature 700MWh of battery storage. Because of its size, it is a nationally significant infrastructure project so outside the standard local planning procedure.

AttributesValues
rdf:type
rdfs:label
  • Cleve Hill solar farm (en)
rdfs:comment
  • Cleve Hill solar farm is a photovoltaic power station that was approved 28 May 2020. It is sited on the Graveney marshes between Faversham and Whitstable, Kent in the UK. It will generate 350MW of electricity from 900 acres (360 ha) vertical solar panels and will feature 700MWh of battery storage. Because of its size, it is a nationally significant infrastructure project so outside the standard local planning procedure. (en)
foaf:name
  • Cleve Hill solar farm (en)
foaf:homepage
name
  • Cleve Hill solar farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Ditches_on_Graveney_marshes_-_geograph.org.uk_-_617077.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Entrance_to_Cleve_Hill_Substation_Construction_Site_-_geograph.org.uk_-_1418009.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
country
  • England (en)
location
  • Kent (en)
status
  • Approved (en)
georss:point
  • 51.3344 0.9429
has abstract
  • Cleve Hill solar farm is a photovoltaic power station that was approved 28 May 2020. It is sited on the Graveney marshes between Faversham and Whitstable, Kent in the UK. It will generate 350MW of electricity from 900 acres (360 ha) vertical solar panels and will feature 700MWh of battery storage. Because of its size, it is a nationally significant infrastructure project so outside the standard local planning procedure. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Approved
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(0.94290000200272 51.334400177002)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software