The Coffin Bay tramway was a 1,435 mm (4 ft 8+1⁄2 in) gauge railway located on the Eyre Peninsula of South Australia. Running for 40 kilometres from Coffin Bay to Billy Lights Point, Port Lincoln it was built and operated by BHP to carry lime sand for steelmaking at Whyalla, Port Kembla and Kwinana. Construction commenced in 1964 with the line opening in 1966. Although built as a high standard railway line, it was known as tramway because of a law that only allowed the Government of South Australia to operate railway lines in the state.

AttributesValues
rdf:type
rdfs:label
  • Coffin Bay tramway (en)
rdfs:comment
  • The Coffin Bay tramway was a 1,435 mm (4 ft 8+1⁄2 in) gauge railway located on the Eyre Peninsula of South Australia. Running for 40 kilometres from Coffin Bay to Billy Lights Point, Port Lincoln it was built and operated by BHP to carry lime sand for steelmaking at Whyalla, Port Kembla and Kwinana. Construction commenced in 1964 with the line opening in 1966. Although built as a high standard railway line, it was known as tramway because of a law that only allowed the Government of South Australia to operate railway lines in the state. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stock
dbp:wikiPageUsesTemplate
close
end
  • Billy Lights Point, Port Lincoln (en)
open
operator
  • BHP (en)
owner
start
status
  • Demolished (en)
has abstract
  • The Coffin Bay tramway was a 1,435 mm (4 ft 8+1⁄2 in) gauge railway located on the Eyre Peninsula of South Australia. Running for 40 kilometres from Coffin Bay to Billy Lights Point, Port Lincoln it was built and operated by BHP to carry lime sand for steelmaking at Whyalla, Port Kembla and Kwinana. Construction commenced in 1964 with the line opening in 1966. Although built as a high standard railway line, it was known as tramway because of a law that only allowed the Government of South Australia to operate railway lines in the state. Two EMD G12 DE class (DE08/09) locomotives were ordered from Clyde Engineering, Sydney for the line. Both entered service in November 1965 on the BHP Whyalla Tramway. Only DE08 was transferred to the Coffin Bay Tramway when it opened in 1966. It returned to Whyalla in 1968, being swapped for two smaller EMD G8 locomotives (DE01/02). A fleet of 31 wagons were built by Comeng, Bassendean. Following storm damage to the wharf at Billy Lights Point, the line closed in 1989. The track was lifted in the early 2000s and reused on the Eyre Peninsula Railway. (en)
linelength km
line length (μ)
railway rolling stock
prov:wasDerivedFrom
page length (characters) of wiki page
closing year
opening year
status
  • Demolished
operator
owner
route end
route start
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software