The Concepcion–Clark Transmission Line (abbreviated as 8LI1CON-CLK, 8LI2CON-CLK) is a 230,000 volt, double-circuit transmission line in Tarlac and Pampanga, Philippines that connects Concepcion Substation of National Grid Corporation of the Philippines (NGCP) and Clark Substation of Clark Electric Distribution Corporation (CEDC).
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
dct:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
tower no |
|
dbp:wikiPageUsesTemplate | |
thumbnail | |
province | |
caption |
|
country | |
operator |
|
owner |
|
photo |
|
start |
|
type | |
georss:point |
|
finish |
|
has abstract |
|
AC voltage |
|
circuits no |
|
current type | |
est |
|
poles no |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |