El Marquesado Wind Farm has a capacity of 198 megawatts (MW) and is Spain's second largest wind farm, located in Granada. With an annual output of 450 gigawatt hours, the El Marquesado complex encompasses four wind farms, each with a capacity of 49.5 MW. All four sites use Gamesa 2 MW turbines. The facility cost some EUR 250 million (US $375 million) to develop.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Parque eólico de El Marquesado (es)
- El Marquesado Wind Farm (en)
- Parco eolico El Marquesado (it)
|
rdfs:comment
| - El Marquesado Wind Farm has a capacity of 198 megawatts (MW) and is Spain's second largest wind farm, located in Granada. With an annual output of 450 gigawatt hours, the El Marquesado complex encompasses four wind farms, each with a capacity of 49.5 MW. All four sites use Gamesa 2 MW turbines. The facility cost some EUR 250 million (US $375 million) to develop. (en)
- El parque eólico de El Marquesado, situado en la comarca de Guadix, Granada, España, era el segundo mayor parque eólico de Europa en potencia en el momento de su inauguración (febrero de 2008), con 198 MW de potencia instalada. El parque, construido por Iberdrola Renovables, significó una inversión de 250 millones de euros. (es)
- Il Parco eolico El Marquesado ha una capacità di 198 MW, è situato a Granada ed è il secondo maggior parco eolico in Spagna. Con una generazione annua di 450 GWh, il complesso El Marquesado comprende quattro parchi eolici ognuno dei quali con una capacità generativa di 49,5 MW. Tutti e quattro i siti usano turbine Gamesa G 80-2MW prodotte dalla Gamesa (da 2 MW ciascuna). Il costo per la costruzione del parco eolico è ammontato a 250 milioni di euro. (it)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - El Marquesado Wind Farm has a capacity of 198 megawatts (MW) and is Spain's second largest wind farm, located in Granada. With an annual output of 450 gigawatt hours, the El Marquesado complex encompasses four wind farms, each with a capacity of 49.5 MW. All four sites use Gamesa 2 MW turbines. The facility cost some EUR 250 million (US $375 million) to develop. (en)
- El parque eólico de El Marquesado, situado en la comarca de Guadix, Granada, España, era el segundo mayor parque eólico de Europa en potencia en el momento de su inauguración (febrero de 2008), con 198 MW de potencia instalada. El parque, construido por Iberdrola Renovables, significó una inversión de 250 millones de euros. (es)
- Il Parco eolico El Marquesado ha una capacità di 198 MW, è situato a Granada ed è il secondo maggior parco eolico in Spagna. Con una generazione annua di 450 GWh, il complesso El Marquesado comprende quattro parchi eolici ognuno dei quali con una capacità generativa di 49,5 MW. Tutti e quattro i siti usano turbine Gamesa G 80-2MW prodotte dalla Gamesa (da 2 MW ciascuna). Il costo per la costruzione del parco eolico è ammontato a 250 milioni di euro. (it)
|
gold:hypernym
| |