About: Fast ferry scandal     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/3rLbfNV4Rq

The fast ferry scandal was a political affair in the late 1990s relating to the construction of three fast ferries by the Canadian provincial crown corporation BC Ferries under direction of the Executive Council of British Columbia, headed at the time by Premier Glen Clark of the New Democratic Party. In addition to major delays and cost overruns, the ferries never fully met their original specifications, and only operated briefly in a reduced capacity, before being auctioned off at a substantial loss. A review was later conducted by British Columbia Auditor General George L. Morfitt.

AttributesValues
rdfs:label
  • Fast ferry scandal (en)
rdfs:comment
  • The fast ferry scandal was a political affair in the late 1990s relating to the construction of three fast ferries by the Canadian provincial crown corporation BC Ferries under direction of the Executive Council of British Columbia, headed at the time by Premier Glen Clark of the New Democratic Party. In addition to major delays and cost overruns, the ferries never fully met their original specifications, and only operated briefly in a reduced capacity, before being auctioned off at a substantial loss. A review was later conducted by British Columbia Auditor General George L. Morfitt. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/PacifiCat_docked_in_Departure_Bay,_19_March_2000.jpg
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • The fast ferry scandal was a political affair in the late 1990s relating to the construction of three fast ferries by the Canadian provincial crown corporation BC Ferries under direction of the Executive Council of British Columbia, headed at the time by Premier Glen Clark of the New Democratic Party. In addition to major delays and cost overruns, the ferries never fully met their original specifications, and only operated briefly in a reduced capacity, before being auctioned off at a substantial loss. A review was later conducted by British Columbia Auditor General George L. Morfitt. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 69 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software