About: GRU Airport People Mover     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FGRU_Airport_People_Mover&invfp=IFP_OFF&sas=SAME_AS_OFF

The GRU Airport People Mover is a future people mover at the São Paulo/Guarulhos International Airport to connect the nearby CPTM railway station to the airport's terminals. This line will be approximately 2.6 km (1.6 mi) long and will have 4 stations, beginning at the Aeroporto-Guarulhos station (with connection to Line 13-Jade) and continuing to separate stations at each of the three terminals. Expression of interest were first invited in August 2019. After signing the contract, construction began in June 2022, with completion estimated to April 2024.

AttributesValues
rdf:type
rdfs:label
  • GRU Airport People Mover (en)
  • Aeromóvel da GRU Airport (pt)
rdfs:comment
  • The GRU Airport People Mover is a future people mover at the São Paulo/Guarulhos International Airport to connect the nearby CPTM railway station to the airport's terminals. This line will be approximately 2.6 km (1.6 mi) long and will have 4 stations, beginning at the Aeroporto-Guarulhos station (with connection to Line 13-Jade) and continuing to separate stations at each of the three terminals. Expression of interest were first invited in August 2019. After signing the contract, construction began in June 2022, with completion estimated to April 2024. (en)
foaf:name
  • GRU Airport People Mover (en)
name
  • GRU Airport People Mover (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/GRUairportlogo.svg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
stock
yearcommenced
dbp:wikiPageUsesTemplate
thumbnail
end
  • Terminal 3 (en)
locale
logo
  • GRUairportlogo.svg (en)
logo width
map state
  • show (en)
operator
owner
start
status
  • Under construction (en)
system
type
has abstract
  • The GRU Airport People Mover is a future people mover at the São Paulo/Guarulhos International Airport to connect the nearby CPTM railway station to the airport's terminals. This line will be approximately 2.6 km (1.6 mi) long and will have 4 stations, beginning at the Aeroporto-Guarulhos station (with connection to Line 13-Jade) and continuing to separate stations at each of the three terminals. Expression of interest were first invited in August 2019. During the opening of the second access on Oscar Freire station, Governor João Doria affirmed that the dealership would have a deadline of 18 months to build the line and opening scheduled for December 2021. In November 2020, the Ministry of Infrastructure signed an authorization term sent to the National Civil Aviation Agency, allowing the construction of the line. In the end of January 2021, the State Secretary of Metropolitan Transports, Alexandre Baldy, announced that the Federal Court of Accounts had approved the people mover project. The order of service, to authorize the beginning of the construction is expected to be signed in the second half of March 2021 by the Ministry of Infrastructure and the Secretariat of Civil Aviation, with a deadline of 18 months. International companies, such as German Siemens, Canadian Bombardier, Chinese BYD and CRRC Sifang, Korean Rotem and Mexican Modutram, showed interest in the project, according to Folha de S. Paulo. In December 2020 it was announced that Brazilian firm Aerom, which owns the Aeromovel technology, had been selected to install the system. Construction was due to begin in January 2021 with completing in 2022. In June 2021 it was announced that the project had 'advanced' but a schedule for construction had not been finalised. The same company installed the Metro-Airport Connection which connect the nearby railway station to the Salgado Filho International Airport in Porto Alegre. On 8 September 2021, Minister of Infrastructure Tarcísio Gomes de Freitas signed the contract for the construction of the people mover, with operation estimated to 2024. After signing the contract, construction began in June 2022, with completion estimated to April 2024. (en)
Character
  • Elevated (en)
planopen
  • April 2024 (en)
line length (μ)
number of stations
railway rolling stock
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Under construction
is part of
operator
owner
route start
type
foaf:isPrimaryTopicOf
is rdfs:seeAlso of
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software