About: GWR No. 12     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailwayLocomotivesIntroducedIn1926, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/2zFjLRMDsG

GWR No. 12 is a Sentinel geared steam locomotive which was built for the Great Western Railway and delivered in 1926. Its Sentinel works number is 6515. It was equipped to work train vacuum brakes and to provide steam heat for passenger trains. Initially, it was based at Swindon and used to work trains on the Malmesbury branch. Later, it worked at Brentford Goods Yard. These trials were not a great success and the locomotive was withdrawn in December 1926 and returned to Sentinel in January 1927.

AttributesValues
rdf:type
rdfs:label
  • GWR No. 12 (en)
rdfs:comment
  • GWR No. 12 is a Sentinel geared steam locomotive which was built for the Great Western Railway and delivered in 1926. Its Sentinel works number is 6515. It was equipped to work train vacuum brakes and to provide steam heat for passenger trains. Initially, it was based at Swindon and used to work trains on the Malmesbury branch. Later, it worked at Brentford Goods Yard. These trials were not a great success and the locomotive was withdrawn in December 1926 and returned to Sentinel in January 1927. (en)
foaf:name
  • GWR No. 12 (en)
  • No 2 Isebrook (from 1934) (en)
name
  • GWR No. 12 (en)
  • No 2 Isebrook (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/No.12_GWR_4wVBT_(Sentinel)_at_Wainhill_(7963470970).jpg
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
builddate
powertype
  • Steam (en)
totalproduction
whytetype
builder
designer
operator
  • GWR (en)
has abstract
  • GWR No. 12 is a Sentinel geared steam locomotive which was built for the Great Western Railway and delivered in 1926. Its Sentinel works number is 6515. It was equipped to work train vacuum brakes and to provide steam heat for passenger trains. Initially, it was based at Swindon and used to work trains on the Malmesbury branch. Later, it worked at Brentford Goods Yard. These trials were not a great success and the locomotive was withdrawn in December 1926 and returned to Sentinel in January 1927. (en)
boilerpressure
cylindercount
  • two (en)
disposition
  • Preserved (en)
fueltype
  • coal (en)
locoweight
prov:wasDerivedFrom
page length (characters) of wiki page
active years end year
active years start year
number built
builder
designer
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 69 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software