About: Grayling Bicycle Turnpike     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatProtectedAreasOfCrawfordCounty,Michigan, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FGrayling_Bicycle_Turnpike&invfp=IFP_OFF&sas=SAME_AS_OFF

The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Weyerhauser Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda. * v * t * e * v * t * e

AttributesValues
rdf:type
rdfs:label
  • Grayling Bicycle Turnpike (en)
rdfs:comment
  • The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Weyerhauser Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda. * v * t * e * v * t * e (en)
name
  • Grayling Bicycle Turnpike (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
trailheads
dbp:wikiPageUsesTemplate
length mi
location
season
  • Year Round (en)
sights
Use
georss:point
  • 44.7098 -84.70997
has abstract
  • The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue. The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Weyerhauser Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda. * v * t * e * v * t * e (en)
difficulty
  • Moderate (en)
hazards
  • Road Crossings, Highway Overpasses, Steep Grade Hills with Sweeping Curves (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-84.709968566895 44.709800720215)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software