The Greefspan II Solar Power Station, also Greefspan 2 Solar Power Station, is a 63.2 MW (84,800 hp) solar power plant in South Africa. It is a grid-connected, privately owned and privately funded solar power station. The solar farm began commercial operations in September 2021. The power station, whose construction started in 2018, was completed in December 2020. The nine months between completion and commercial commissioning were spent performing "grid connection tests" and other calibrations.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Greefspan II Solar Power Station (en)
|
rdfs:comment
| - The Greefspan II Solar Power Station, also Greefspan 2 Solar Power Station, is a 63.2 MW (84,800 hp) solar power plant in South Africa. It is a grid-connected, privately owned and privately funded solar power station. The solar farm began commercial operations in September 2021. The power station, whose construction started in 2018, was completed in December 2020. The nine months between completion and commercial commissioning were spent performing "grid connection tests" and other calibrations. (en)
|
foaf:name
| - Greefspan II Solar Power Station (en)
|
name
| - Greefspan II Solar Power Station (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
solar type
| |
thermal capacity
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| - Higgs' Hope, Pixley ka Seme District, Northern Cape Province (en)
|
operator
| |
owner
| - Greefspan II Solar Consortium (en)
|
pushpin map
| |
status
| |
commissioned
| |
georss:point
| - -29.385555555555555 23.315
|
has abstract
| - The Greefspan II Solar Power Station, also Greefspan 2 Solar Power Station, is a 63.2 MW (84,800 hp) solar power plant in South Africa. It is a grid-connected, privately owned and privately funded solar power station. The solar farm began commercial operations in September 2021. The power station, whose construction started in 2018, was completed in December 2020. The nine months between completion and commercial commissioning were spent performing "grid connection tests" and other calibrations. (en)
|
construction began
| |
ps units operational
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
opening year
| |
status
| |
installed capacity (W)
| |
country
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(23.315000534058 -29.385555267334)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |