The Huanggou Pumped Storage Power Station is a 1,200 MW pumped-storage hydroelectric power station currently under construction about 90 km (56 mi) north of Mudanjiang in Hailin County of Heilongjiang Province, China. Construction on the project began on 8 May 2014. The first generator is scheduled to be commissioned in January 2019 and the project complete in January 2020. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir, Lianhua Reservoir, is located on the Mudan River and the upper reservoir is located in a valley above the north side of the lower reservoir. During periods of low energy demand, such as at night, water is pumped from Huanggou Lower Reservoir up to the upper reservoir. When energy demand is high

AttributesValues
rdf:type
rdfs:label
  • Huanggou Pumped Storage Power Station (en)
  • ГАЕС Хейлунцзянь (uk)
rdfs:comment
  • The Huanggou Pumped Storage Power Station is a 1,200 MW pumped-storage hydroelectric power station currently under construction about 90 km (56 mi) north of Mudanjiang in Hailin County of Heilongjiang Province, China. Construction on the project began on 8 May 2014. The first generator is scheduled to be commissioned in January 2019 and the project complete in January 2020. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir, Lianhua Reservoir, is located on the Mudan River and the upper reservoir is located in a valley above the north side of the lower reservoir. During periods of low energy demand, such as at night, water is pumped from Huanggou Lower Reservoir up to the upper reservoir. When energy demand is high (en)
  • ГАЕС Хейлунцзянь (黑龙江抽水蓄能电站) — гідроакумулювальна електростанція, що споруджується на північному сході Китаю у провінції Хейлунцзян. Як нижній резервуар станції використають водосховище ГЕС Ляньхуа, створене у 1990-х роках на річці Муданьцзян (права притока Сунгарі, котра, своєю чергою, є правою притокою Амуру). Його утримує головна кам'яно-накидна гребля із бетонним облицюванням висотою 72 метри та довжиною 902 метрів, а також розташована ліворуч від неї у сідловині кам'яно-накидна споруда із глиняним ядром висотою 47 метрів та довжиною 332 метри. Створене ними велике водосховище має об'єм 4,18 млрд м3 (корисний об'єм 2,72 млрд м3) та нормальний рівень поверхні на позначці 218 метрів НРМ. (uk)
foaf:name
  • Huanggou Pumped Storage Power Station (en)
name
  • Huanggou Pumped Storage Power Station (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
country
  • China (en)
location
opening
operator
status
  • UC (en)
georss:point
  • 45.34308055555555 129.70115833333332
has abstract
  • The Huanggou Pumped Storage Power Station is a 1,200 MW pumped-storage hydroelectric power station currently under construction about 90 km (56 mi) north of Mudanjiang in Hailin County of Heilongjiang Province, China. Construction on the project began on 8 May 2014. The first generator is scheduled to be commissioned in January 2019 and the project complete in January 2020. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir, Lianhua Reservoir, is located on the Mudan River and the upper reservoir is located in a valley above the north side of the lower reservoir. During periods of low energy demand, such as at night, water is pumped from Huanggou Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant serves as a peaking power plant. It is operated by the State Grid Corporation of China. The lower Lianhua Reservoir is created by the 71.8 m (236 ft) tall and 902 m (2,959 ft) long Lianhua Dam, a rock-fill dam on the Mudan River. It can withhold up to 4,180,000,000 m3 (3,390,000 acre⋅ft) of water. The upper reservoir is created by an 80 m (260 ft) tall and 744.2 m (2,442 ft) long concrete-face rock-fill dam. It can withhold up to 11,610,000 m3 (9,410 acre⋅ft) of water, of which 10,280,000 m3 (8,330 acre⋅ft) can be used for power production. Water from the upper reservoir is sent to the underground power station down near the lower reservoir through headrace/penstock pipes. The power station contains four 300 MW Francis pump turbines. The difference in elevation between the upper and lower reservoir affords a hydraulic head (water drop) of 434.5 m (1,426 ft). (en)
  • ГАЕС Хейлунцзянь (黑龙江抽水蓄能电站) — гідроакумулювальна електростанція, що споруджується на північному сході Китаю у провінції Хейлунцзян. Як нижній резервуар станції використають водосховище ГЕС Ляньхуа, створене у 1990-х роках на річці Муданьцзян (права притока Сунгарі, котра, своєю чергою, є правою притокою Амуру). Його утримує головна кам'яно-накидна гребля із бетонним облицюванням висотою 72 метри та довжиною 902 метрів, а також розташована ліворуч від неї у сідловині кам'яно-накидна споруда із глиняним ядром висотою 47 метрів та довжиною 332 метри. Створене ними велике водосховище має об'єм 4,18 млрд м3 (корисний об'єм 2,72 млрд м3) та нормальний рівень поверхні на позначці 218 метрів НРМ. Верхній резервуар спорудять на висотах лівобережжя Муданьцзян за допомогою кам'яно-накидної греблі із бетонним облицюванням висотою 83 метри. Це сховище матиме об'єм 11,6 млн м3 та нормальний рівень поверхні на позначці 625,5 метра НРМ. Резервуари будуть з'єднані між собою та з розташованим поміж ними машинним залом за допомогою двох тунельних трас довжиною по 3 км із діаметром від 4,7 до 6,7 метра. Станцію обладнають чотирма оборотними турбінами типу Френсіс потужністю по 300 МВт, які, за проєктом, забезпечуватимуть виробництво 1836 млн кВт·год електроенергії на рік при споживанні для закачування 2409 млн кВт·год. Будівництво станції почалось у 2014-му, а введення гідроагрегатів у експлуатацію заплановане на 2020—2021 роки. (uk)
construction began
lower res name
plant annual gen
plant capacity
plant turbines
res name
  • Huanggou Upper (en)
vastest lake
part
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2014
opening year
status
  • UC
operator
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(129.70115661621 45.343082427979)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software