The Hwange Thermal Power Station is the biggest power plant in Zimbabwe with an installed capacity of 920 MW. It is owned and operated by the national electricity company Zimbabwe Electricity Supply Authority. It was built in two stages and consists of 4 units of 120 MW each and 2 units of 220 MW each. Engineering Consultants, Merz & McLellan, were employed for the design and supervision of the construction of the power station. Construction of Stage 1 commenced in 1973, but was suspended in 1975 due to economic sanctions imposed on Rhodesia. Stage 1's units were commissioned from 1983 to 1986 with Stage 2's units following in 1986 and1987.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Hwange Thermal Power Station (en)
- Centrale thermique de Hwange (fr)
- 津巴布韦旺吉电站 (zh)
- ТЕС Хванге (uk)
|
rdfs:comment
| - La centrale thermique de Hwange est une centrale thermique au charbon en Zimbabwe à Hwange. C'est la plus grande centrale du pays. Sa capacité installée est de 920 MW. La (ZESA), entreprise publique d'électricité, en est propriétaire et assure son fonctionnement. (fr)
- 津巴布韦旺吉电站位于津巴布韦北马塔贝莱兰省的旺吉镇,位于津巴布韦首都哈拉雷西方约485公里(301英里),该地拥有丰富的煤炭和野生动植物资源。该电站是津巴布韦最大的电站,总安装发电量为920MW。由于年久失修、设备老化等原因,实际出力不到500 MW。 中国电力建设集团承建的旺吉电站三期扩建工程在非洲的首个投建营一体化项目。项目由电站和输变电两部分组成,电站部分为2×335MW亚临界燃煤机组及配套附属设施,项目建成后,装机总容量将扩大至152万千瓦,能满足津巴布韦全国用电50%的需求,大大缓解津巴布韦用电短缺局面。 (zh)
- The Hwange Thermal Power Station is the biggest power plant in Zimbabwe with an installed capacity of 920 MW. It is owned and operated by the national electricity company Zimbabwe Electricity Supply Authority. It was built in two stages and consists of 4 units of 120 MW each and 2 units of 220 MW each. Engineering Consultants, Merz & McLellan, were employed for the design and supervision of the construction of the power station. Construction of Stage 1 commenced in 1973, but was suspended in 1975 due to economic sanctions imposed on Rhodesia. Stage 1's units were commissioned from 1983 to 1986 with Stage 2's units following in 1986 and1987. (en)
- ТЕС Хванге — теплова електростанція на заході Зімбабве, неподалік від кордонів з Ботсваною та Замбією. З моменту свого спорудження стала найпотужнішою ТЕС країни. Як і інші теплові електростанції Зімбабве, ТЕС Хванге відноситься до конденсаційних та розрахована на використання вугілля. Воно постачається сюди по конвеєру довжиною 3,5 км з розташованого поруч кар'єру. Для охолодження станція використовує воду із річки Замбезі, яка подається по трубопроводу довжиною 44 км та діаметром метр. (uk)
|
differentFrom
| |
name
| - Hwange Thermal Power Station (en)
|
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
th fuel primary
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
operator
| |
status
| |
commissioned
| |
georss:point
| - -18.383376388888887 26.470008333333332
|
has abstract
| - The Hwange Thermal Power Station is the biggest power plant in Zimbabwe with an installed capacity of 920 MW. It is owned and operated by the national electricity company Zimbabwe Electricity Supply Authority. It was built in two stages and consists of 4 units of 120 MW each and 2 units of 220 MW each. Engineering Consultants, Merz & McLellan, were employed for the design and supervision of the construction of the power station. Construction of Stage 1 commenced in 1973, but was suspended in 1975 due to economic sanctions imposed on Rhodesia. Stage 1's units were commissioned from 1983 to 1986 with Stage 2's units following in 1986 and1987. A reliable source of water lies further north, in the Zambezi River. From there, through a 44 kilometres (27 mi) long pipeline, water for the boilers and cooling towers is drawn by both high and low lift pumps to a storage reservoir located adjacent to the station and conveyed by gravity to the station. About 107,000 cubic metres (3,778,669 cu ft) of raw water can be provided every day. The demineralisation plant has a capacity of 5,420 cubic metres (191,405 cu ft) per day. A conveyor belt that measures 3.5 kilometres (2.2 mi) long, brings about 1,750 tonnes (1,750,000 kg) of coal per hour from the nearby Wankie Colliery open cast mine, and 250,000 tonnes of coal are stockpiled on site. Coal reserves estimated to support 1,200 MW for an estimated 30 years are concealed beneath the vast expanse of the coal mine. Technical problems due to neglect of maintenance, part replacement and upgrading make the plant prone to frequent production stops. In 2009, Namibia's NamPower made agreements to help ZESA to revive the plant's capacity in exchange for power deliveries. The extensive problems are however continuing and have even led the government to considering a full closure of the plant. In April 2008, Chadha Power of India secured a contract to refurbish four units at the power plant. In December 2015 China agreed to provide a $1.2 billion loan to add 600 MW of generating capacity to the Hwange power station with two additional units. (en)
- La centrale thermique de Hwange est une centrale thermique au charbon en Zimbabwe à Hwange. C'est la plus grande centrale du pays. Sa capacité installée est de 920 MW. La (ZESA), entreprise publique d'électricité, en est propriétaire et assure son fonctionnement. (fr)
- 津巴布韦旺吉电站位于津巴布韦北马塔贝莱兰省的旺吉镇,位于津巴布韦首都哈拉雷西方约485公里(301英里),该地拥有丰富的煤炭和野生动植物资源。该电站是津巴布韦最大的电站,总安装发电量为920MW。由于年久失修、设备老化等原因,实际出力不到500 MW。 中国电力建设集团承建的旺吉电站三期扩建工程在非洲的首个投建营一体化项目。项目由电站和输变电两部分组成,电站部分为2×335MW亚临界燃煤机组及配套附属设施,项目建成后,装机总容量将扩大至152万千瓦,能满足津巴布韦全国用电50%的需求,大大缓解津巴布韦用电短缺局面。 (zh)
- ТЕС Хванге — теплова електростанція на заході Зімбабве, неподалік від кордонів з Ботсваною та Замбією. З моменту свого спорудження стала найпотужнішою ТЕС країни. Як і інші теплові електростанції Зімбабве, ТЕС Хванге відноситься до конденсаційних та розрахована на використання вугілля. Воно постачається сюди по конвеєру довжиною 3,5 км з розташованого поруч кар'єру. Спорудження першої черги у складі чотирьох енергоблоків потужністю по 120 МВт стартувало у 1973-му. За два роки через санкції, накладені на Південну Родезію за утиски урядом білих місцевого населення, виникли проблеми з постачанням замовленого за кордоном основного обладнання. Втім, будівельні роботи на майданчику продовжувались, а в 1980-му були розблоковані імпортні поставки. В результаті у 1984-му ввели в експлуатацію першу чергу, а ще за три роки стала до ладу друга у складі двох турбін по 220 МВт. Для охолодження станція використовує воду із річки Замбезі, яка подається по трубопроводу довжиною 44 км та діаметром метр. На початку 21 століття ТЕС Хванге, як і інші електростанції Зімбабве, мала проблеми з підтримкою працездатності обладнання. В січні 2018-го після відновлення одного з блоків вдалось підняти фактичну потужність станції до 661 МВт. Можливо відзначити, що в той же час через дефіцит іноземної валюти копальня Хванге не могла придбати необхідні запасні частини, що загрожувало нестачею палива. (uk)
|
construction began
| |
location map caption
| - Location of Hwange Thermal Power Station within Zimbabwe (en)
|
ps electrical capacity
| |
ps units manu model
| |
ps units operational
| |
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(26.470008850098 -18.383377075195)
|
is differentFrom
of | |
is Link from a Wikipage to another Wikipage
of | |