About: Hydrogen Energy California     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatPowerStationsInCalifornia, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FHydrogen_Energy_California&invfp=IFP_OFF&sas=SAME_AS_OFF

Hydrogen Energy California (HECA) was an alternative energy, hydrogen power project in development with support from the U.S. Department of Energy in Kern County, California. The facility proposed to convert coal and refinery waste into an impure hydrogen fuel that would be used to generate electricity and fertilizer. HECA was supposed to capture ninety percent of its carbon dioxide (CO2) emissions to theoretically minimize greenhouse gas (GHG) emissions and inject it, for enhanced oil recovery. If it had become fully operational, HECA would have generated nearly 300MW of clean electricity and will produce one million tons of locally manufactured, low-carbon fertilizer. But, most of the electricity produced by HECA would have been consumed by the different processes at the plant.On March 4

AttributesValues
rdf:type
rdfs:label
  • Hydrogen Energy California (en)
rdfs:comment
  • Hydrogen Energy California (HECA) was an alternative energy, hydrogen power project in development with support from the U.S. Department of Energy in Kern County, California. The facility proposed to convert coal and refinery waste into an impure hydrogen fuel that would be used to generate electricity and fertilizer. HECA was supposed to capture ninety percent of its carbon dioxide (CO2) emissions to theoretically minimize greenhouse gas (GHG) emissions and inject it, for enhanced oil recovery. If it had become fully operational, HECA would have generated nearly 300MW of clean electricity and will produce one million tons of locally manufactured, low-carbon fertilizer. But, most of the electricity produced by HECA would have been consumed by the different processes at the plant.On March 4 (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Hydrogen_Energy_California_Process_Graphic.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • Hydrogen Energy California (HECA) was an alternative energy, hydrogen power project in development with support from the U.S. Department of Energy in Kern County, California. The facility proposed to convert coal and refinery waste into an impure hydrogen fuel that would be used to generate electricity and fertilizer. HECA was supposed to capture ninety percent of its carbon dioxide (CO2) emissions to theoretically minimize greenhouse gas (GHG) emissions and inject it, for enhanced oil recovery. If it had become fully operational, HECA would have generated nearly 300MW of clean electricity and will produce one million tons of locally manufactured, low-carbon fertilizer. But, most of the electricity produced by HECA would have been consumed by the different processes at the plant.On March 4, 2016, the California Energy Commission ordered the HECA application to be terminated. HECA would have produced over 500 tons of criteria air pollutants. This air pollution would have been added to an area that already has the worst air pollution in the entire United States. The facility was to be located on 542-acre (219 ha) of prime farmland in western Kern County, about 7 miles (11 km) west of Bakersfield and 1.5 miles (2.4 km) northwest of the unincorporated community of Tupman. The site is near the Elk Hills Oil Field where the captured CO2 was to be used for enhanced oil recovery by Occidental of Elk Hills, Inc. HECA would have employed an expected 2,000 union workers to construct the facility and would have created approximately 200 permanent jobs. HECA was a project of SCS Energy LLC, an independent developer of clean power. HECA was cofunded by the U.S. Department of Energy’s Office of Fossil Energy and administered by the National Energy Technology Laboratory. The HECA project was awarded a $408 million grant by the U.S. Department of Energy under Clean Coal Power Initiative Round 3. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software