Hywind Scotland is the world's first commercial wind farm using floating wind turbines, situated 29 kilometres (18 mi) off Peterhead, Scotland. The farm has five 6 MW Siemens direct-drive turbines on Hywind floating monopiles, with a total capacity of 30 MW. It is operated by Hywind (Scotland) Limited, a joint venture of Equinor (75%) and Masdar (25%). The subsequent 94 MW Hywind Tampen (with concrete floating foundations) was under construction at the Snorre and Gullfaks oil fields in Norway in 2022.

AttributesValues
rdf:type
rdfs:label
  • Hywind Scotland (de)
  • Hywind Scotland (en)
rdfs:comment
  • Hywind Scotland ist der weltweit erste kommerziell genutzte Windpark, der aus schwimmenden Windkraftanlagen besteht, und seit 2017 in Betrieb. Der Park liegt etwa 29 Kilometer vor Peterhead an der Küste Schottlands in der Nordsee. Hywind Scotland besteht aus 5 Windkraftanlagen vom Typ Siemens SWT-6.0-154 mit einer Gesamtleistung von 30 MW. Er wird betrieben von Hywind (Scotland) Limited, einem Joint Venture der Equinor (75 % Anteil) und Masdar (25 %). Im Jahr 2020 lag der Kapazitätsfaktor des Windparks bei 57,1 %. In den beiden Jahren zuvor waren es durchschnittlich 54 % gewesen. (de)
  • Hywind Scotland is the world's first commercial wind farm using floating wind turbines, situated 29 kilometres (18 mi) off Peterhead, Scotland. The farm has five 6 MW Siemens direct-drive turbines on Hywind floating monopiles, with a total capacity of 30 MW. It is operated by Hywind (Scotland) Limited, a joint venture of Equinor (75%) and Masdar (25%). The subsequent 94 MW Hywind Tampen (with concrete floating foundations) was under construction at the Snorre and Gullfaks oil fields in Norway in 2022. (en)
foaf:name
  • Hywind Scotland (en)
name
  • Hywind Scotland (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
wind farm type
  • Offshore (en)
dbp:wikiPageUsesTemplate
cost
country
  • Scotland, United Kingdom (en)
location
  • Scotland, Grampian (en)
operator
  • Hywind Limited (en)
owner
status
  • O (en)
commissioned
  • October 2017 (en)
georss:point
  • 57.483333333333334 -1.35
has abstract
  • Hywind Scotland ist der weltweit erste kommerziell genutzte Windpark, der aus schwimmenden Windkraftanlagen besteht, und seit 2017 in Betrieb. Der Park liegt etwa 29 Kilometer vor Peterhead an der Küste Schottlands in der Nordsee. Hywind Scotland besteht aus 5 Windkraftanlagen vom Typ Siemens SWT-6.0-154 mit einer Gesamtleistung von 30 MW. Er wird betrieben von Hywind (Scotland) Limited, einem Joint Venture der Equinor (75 % Anteil) und Masdar (25 %). Im Jahr 2020 lag der Kapazitätsfaktor des Windparks bei 57,1 %. In den beiden Jahren zuvor waren es durchschnittlich 54 % gewesen. (de)
  • Hywind Scotland is the world's first commercial wind farm using floating wind turbines, situated 29 kilometres (18 mi) off Peterhead, Scotland. The farm has five 6 MW Siemens direct-drive turbines on Hywind floating monopiles, with a total capacity of 30 MW. It is operated by Hywind (Scotland) Limited, a joint venture of Equinor (75%) and Masdar (25%). Equinor (then: Statoil) launched the world's first operational deep-water floating large-capacity wind turbine, the US$71 million 2.3 MW Hywind ($31/W), in 2009. The 120 metres (390 ft) tall tower with a 2.3 MW Siemens turbine was towed from the Åmøy fjord and 10 kilometres (6.2 mi) offshore into the North Sea in 220 metres (720 ft) deep water, off of Stavanger, Norway on 9 June 2009 for a two-year test run, but remains working at the site while surviving 40 m/s (89 mph) wind speed and 19 m waves. In 2015, the company received permission to install the wind farm in Scotland, in an attempt at reducing the cost relative to the original Hywind, in accordance with the Scottish Government's commitment for cost reduction. Manufacturing for the project, with a budgeted cost of NOK2 billion (£152m), started in 2016 in Spain, Norway and Scotland. The turbines were assembled at Stord in Norway in summer 2017 using the Saipem 7000 floating crane, and the finished turbines were moved to near Peterhead. Three suction anchors hold each turbine. Hywind Scotland was commissioned in October 2017. While cost was reduced compared to the very expensive Hywind One at $31m/MW, it still came with a final capital cost of £264m, or £8.8m/MW, approximately three times the capital cost of fixed offshore windfarms. Measured by unit cost, its levelized cost of energy (LCoE) is then £180/MWh ($248/MWh), about three times the typical LCoE of a fixed offshore wind farm at £55/MWh ($75.7/MWh). The high cost is partly compensated by £165.27/MWh from Renewable Obligation Certificates. In its first years of operation the facility has averaged a capacity factor in excess of 50%. By shutting down at the worst conditions, it survived Hurricane Ophelia, and then Storm Caroline with wind gusts at 160 km/h (99 mph) and waves of 8.2 metres. The subsequent 94 MW Hywind Tampen (with concrete floating foundations) was under construction at the Snorre and Gullfaks oil fields in Norway in 2022. (en)
construction began
ps electrical cap fac
ps electrical capacity
ps units manu model
  • Siemens Wind Power SWT-6.0-154 (en)
ps units operational
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2016
opening year
status
  • O
installed capacity (W)
country
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-1.3500000238419 57.483333587646)
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 62 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software