The Ikervár Wind Farm is a wind power project in Vas County, Hungary. It has 17 individual wind turbines with a nominal output of around 2 MW delivering up to 34 MW of power, with a capital investment required of approximately US$81 million. Construction works were finished in early spring 2011, the trial operation ended on 31 March.After the successful trial operation, 17 wind turbines have been put into operation on 1 April 2011

AttributesValues
rdf:type
rdfs:label
  • Ikervár Wind Farm (en)
rdfs:comment
  • The Ikervár Wind Farm is a wind power project in Vas County, Hungary. It has 17 individual wind turbines with a nominal output of around 2 MW delivering up to 34 MW of power, with a capital investment required of approximately US$81 million. Construction works were finished in early spring 2011, the trial operation ended on 31 March.After the successful trial operation, 17 wind turbines have been put into operation on 1 April 2011 (en)
foaf:name
  • Ikervár Wind Farm (en)
name
  • Ikervár Wind Farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Ikervár_szélerőműpark.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
location
owner
status
  • Operational (en)
commissioned
georss:point
  • 47.200833333333335 16.86888888888889
has abstract
  • The Ikervár Wind Farm is a wind power project in Vas County, Hungary. It has 17 individual wind turbines with a nominal output of around 2 MW delivering up to 34 MW of power, with a capital investment required of approximately US$81 million. Construction works were finished in early spring 2011, the trial operation ended on 31 March.After the successful trial operation, 17 wind turbines have been put into operation on 1 April 2011 Iberdola Renovables installed wind turbines model G90 made by Gamesa of Spain. These wind turbines are 100 metre high and have 44 metre long blades. The nominal output of each wind turbine is two MW. Gamesa is responsible for manufacturing, delivering and installing the turbines. After putting into operation, maintenance will be provided under Gamesa's supervision during the two-year warranty period, after which it will be taken over by the local team. (en)
ps electrical capacity
ps units operational
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
opening date
opening year
status
  • Operational
installed capacity (W)
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(16.86888885498 47.200832366943)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software