About: Interurban Trail (King County)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailTrailsInWashington(state), within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FInterurban_Trail_%28King_County%29&invfp=IFP_OFF&sas=SAME_AS_OFF

The Interurban Trail South is a rail trail in King and Pierce counties, Washington. The interurban trail North is a bicycle route running from Downtown Seattle through Shoreline and to the Snohomish County, Washington line. The trail occupies an abandoned Puget Sound Electric Railway corridor and connects to the Green River Trail.

AttributesValues
rdf:type
rdfs:label
  • Interurban Trail (King County) (en)
rdfs:comment
  • The Interurban Trail South is a rail trail in King and Pierce counties, Washington. The interurban trail North is a bicycle route running from Downtown Seattle through Shoreline and to the Snohomish County, Washington line. The trail occupies an abandoned Puget Sound Electric Railway corridor and connects to the Green River Trail. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Interurban-Trail-Sign-WA.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Interurban_Trail.gif
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • 47.46361111111111 -122.24472222222222
has abstract
  • The Interurban Trail South is a rail trail in King and Pierce counties, Washington. The interurban trail North is a bicycle route running from Downtown Seattle through Shoreline and to the Snohomish County, Washington line. The Interurban Trail South is a partially paved 14-mile (23 km) recreational trail open for non-motorized use. It connects Tukwila to Pacific, and the towns of Kent, Auburn, and Algona along the way. Additionally, the Cities of Edgewood and Milton have completed and opened paved segments of the Interurban trail that are not yet connected to the main segment from Tukwila to Pacific, and the City of Fife has a short segment now under construction. When planned construction is completed to close the gaps in Pacific, Edgewood, and Milton, the trail will extend from Tukwila to Fife. The trail occupies an abandoned Puget Sound Electric Railway corridor and connects to the Green River Trail. In addition to the main line of the Interurban trail between Tukwila and Fife the Interurban Trail will connect to the planned northerly extension of the Foothills Trail through Puyallup and Sumner. When that connection is completed, a continuous trail will extend south through Pacific, across the county line into Sumner and Puyallup where it will connect with the existing Pierce County Foothills Trail to South Prairie and the planned extension of the Foothills trail to Buckley and Enumclaw. The Interurban Trail North begins as a signed bicycle route in downtown Seattle running through the Fremont neighborhood, through Phinney Ridge and Greenwood, to 110th and Fremont where it becomes a paved rail trail until 128th and Linden where it will become a cycletrack to the City of Shoreline Border. At the City of Shoreline the route becomes a wide non-motorized route for 3 miles until the Snohomish County line. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-122.24472045898 47.463611602783)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software