Kallarkutty Dam is a dam built on the Muthirapuzha river, a tributary of the Periyar River, as part of the Neryamangalam Hydroelectric Project at in Vellathooval Panchayath, Idukki District, Kerala. The water discharged from the Chenkulam Dam's powerhouse and the is diverted to the Powerhouse near above the Lower Periyar Dam. The Hydroelectric Project was commissioned on 27 January 1961 to generate 45 MW of power using 3 turbines with a capacity of 15 MW. In 2006, the project was upgraded from 45 MW to 52.65 MW. Taluks through which release flow are Udumpanchola, Devikulam, Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.
Attributes | Values |
---|
rdfs:label
| |
rdfs:comment
| - Kallarkutty Dam is a dam built on the Muthirapuzha river, a tributary of the Periyar River, as part of the Neryamangalam Hydroelectric Project at in Vellathooval Panchayath, Idukki District, Kerala. The water discharged from the Chenkulam Dam's powerhouse and the is diverted to the Powerhouse near above the Lower Periyar Dam. The Hydroelectric Project was commissioned on 27 January 1961 to generate 45 MW of power using 3 turbines with a capacity of 15 MW. In 2006, the project was upgraded from 45 MW to 52.65 MW. Taluks through which release flow are Udumpanchola, Devikulam, Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur. (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
has abstract
| - Kallarkutty Dam is a dam built on the Muthirapuzha river, a tributary of the Periyar River, as part of the Neryamangalam Hydroelectric Project at in Vellathooval Panchayath, Idukki District, Kerala. The water discharged from the Chenkulam Dam's powerhouse and the is diverted to the Powerhouse near above the Lower Periyar Dam. The Hydroelectric Project was commissioned on 27 January 1961 to generate 45 MW of power using 3 turbines with a capacity of 15 MW. In 2006, the project was upgraded from 45 MW to 52.65 MW. Taluks through which release flow are Udumpanchola, Devikulam, Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |