About: Koru (Ankara Metro)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Station, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FKoru_%28Ankara_Metro%29&invfp=IFP_OFF&sas=SAME_AS_OFF

Koru is an underground rapid transit station and the western terminus of the line of the Ankara Metro. It is also the southwest terminus of the 46.6 km (29.0 mi) long continuous metro line, consisting of the M1, M2 and M3 lines. The station is located along Ankaralılar Avenue within Ahmet Taner Kışlalı Park and was opened on 13 March 2014. Connections to service is available on Şeyh Mucibur Rahman Boulevard. This station is secondary depot station in Ankara Metro(main depot station located at Macunköy station). Trains are added to and removed from the system from this station. The addition/removal process is done with a railway switch that connects to the mainline from the yard lines close to the station.

AttributesValues
rdf:type
rdfs:label
  • Koru (Ankara Metro) (en)
rdfs:comment
  • Koru is an underground rapid transit station and the western terminus of the line of the Ankara Metro. It is also the southwest terminus of the 46.6 km (29.0 mi) long continuous metro line, consisting of the M1, M2 and M3 lines. The station is located along Ankaralılar Avenue within Ahmet Taner Kışlalı Park and was opened on 13 March 2014. Connections to service is available on Şeyh Mucibur Rahman Boulevard. This station is secondary depot station in Ankara Metro(main depot station located at Macunköy station). Trains are added to and removed from the system from this station. The addition/removal process is done with a railway switch that connects to the mainline from the yard lines close to the station. (en)
foaf:name
  • KORU (en)
foaf:homepage
name
  • KORU (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/AnkaraMetroLogo.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/Koru_İstasyonu-Ankara_Metrosu,_M2_Hattı-Ankara_Raylı_Sistemi.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
ADA
  • Yes (en)
address
  • Ankaralılar Cd., Koru Mah., 06810 (en)
borough
electrified
line
opened
operator
Other
  • EGO Bus: 584, 586, 587, 588, 588-1, 590, 592, 592-1, 593, 594, 595,596, 598, 598-1 (en)
owned
parking
  • Yes (en)
platform
structure
  • Underground (en)
style
  • Ankara Metro (en)
type
  • Ankara Metro rapid transit station (en)
georss:point
  • 39.8876 32.687
has abstract
  • Koru is an underground rapid transit station and the western terminus of the line of the Ankara Metro. It is also the southwest terminus of the 46.6 km (29.0 mi) long continuous metro line, consisting of the M1, M2 and M3 lines. The station is located along Ankaralılar Avenue within Ahmet Taner Kışlalı Park and was opened on 13 March 2014. Connections to service is available on Şeyh Mucibur Rahman Boulevard. This station is secondary depot station in Ankara Metro(main depot station located at Macunköy station). Trains are added to and removed from the system from this station. The addition/removal process is done with a railway switch that connects to the mainline from the yard lines close to the station. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
address
  • Ankaralılar Cd., Koru Mah., 06810 (en)
is handicapped accessible
opening date
opening year
other serving lines
  • EGO Bus: 584, 586, 587, 588, 588-1, 590, 592, 592-1, 593, 594, 595,596, 598, 598-1
parking information
  • Yes
railway platforms
  • 1island platform
station structure
  • Underground
year of electrification
owner
owning organisation
serving railway line
type
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(32.687000274658 39.887599945068)
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software