Lakewood High School (commonly known as Lakewood or LHS) is a public secondary school in what was Arlington, but annexed to become an addition of Marysville, Washington, serving students in grades 9–12. The school is the only secondary school in the Lakewood School District, serving the Lake Goodwin, North Lakewood, and Smokey Point areas.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Lakewood High School (Washington) (en)
|
rdfs:comment
| - Lakewood High School (commonly known as Lakewood or LHS) is a public secondary school in what was Arlington, but annexed to become an addition of Marysville, Washington, serving students in grades 9–12. The school is the only secondary school in the Lakewood School District, serving the Lake Goodwin, North Lakewood, and Smokey Point areas. (en)
|
foaf:name
| - (en)
- Lakewood High School (en)
|
foaf:homepage
| |
name
| - Lakewood High School (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
us nces school id
| |
zipcode
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
schooltype
| |
streetaddress
| |
caption
| - (The front entrance of the high school's main office, seen in 2013) (en)
|
city
| |
Colors
| |
country
| |
district
| |
mascot
| |
motto
| - A Small District Going Big Places (en)
|
ratio
| |
state
| |
website
| |
georss:point
| - 48.15111111111111 -122.2136111111111
|
has abstract
| - Lakewood High School (commonly known as Lakewood or LHS) is a public secondary school in what was Arlington, but annexed to become an addition of Marysville, Washington, serving students in grades 9–12. The school is the only secondary school in the Lakewood School District, serving the Lake Goodwin, North Lakewood, and Smokey Point areas. The original high school was built in 1983 and expanded in later years to accommodate a growing school population. A $66.8 million bond measure was passed in April 2014 to design and build a new high school on the same campus, with a capacity of 825 students. Construction began in May 2016. The new two-story, 160,000 square feet (15,000 m2) building opened in September 2017 while demolition of the old building was still in progress. (en)
|