The Lane Avenue Bridge is a cable-stayed bridge over the Olentangy River in the American city of Columbus, Ohio. Designed by Jones-Stuckey Ltd., the construction was completed on November 14, 2003, after only sixteen months, five months ahead of schedule. The bridge is 113 meters (371 feet) in length, carrying six 3.5 meters (11 feet) wide lanes for vehicle traffic, as well as two 3.5 meter sidewalks. The cable stayed design was chosen for aesthetic reasons, as well as having a smaller potential for environmental degradation on the river environment. The anchorages for the cables, at 47 tons (104,000 lbs), are noted as being the heaviest single pieces of steel ever to be galvanized. Total price for the project was US$15.6 million with the following funding sources:

AttributesValues
rdf:type
rdfs:label
  • Lane Avenue Bridge (en)
rdfs:comment
  • The Lane Avenue Bridge is a cable-stayed bridge over the Olentangy River in the American city of Columbus, Ohio. Designed by Jones-Stuckey Ltd., the construction was completed on November 14, 2003, after only sixteen months, five months ahead of schedule. The bridge is 113 meters (371 feet) in length, carrying six 3.5 meters (11 feet) wide lanes for vehicle traffic, as well as two 3.5 meter sidewalks. The cable stayed design was chosen for aesthetic reasons, as well as having a smaller potential for environmental degradation on the river environment. The anchorages for the cables, at 47 tons (104,000 lbs), are noted as being the heaviest single pieces of steel ever to be galvanized. Total price for the project was US$15.6 million with the following funding sources: (en)
foaf:name
  • Lane Avenue Bridge (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Columbus-olentangy-river-bridge-night.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Lane_Ave_3.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
begin
complete
bridge name
  • Lane Avenue Bridge (en)
caption
  • The bridge looking Northeast (en)
carries
  • Lane Avenue (en)
crosses
design
  • Cable Stayed (en)
designer
  • Jones-Stuckey Ltd., Civil Engineering Firm, Columbus, Ohio (en)
locale
  • Columbus, Ohio, USA (en)
maint
  • Franklin County Engineer (en)
open
georss:point
  • 40.0065 -83.022
mapframe-caption
  • Interactive map outlining the Lane Avenue Bridge (en)
has abstract
  • The Lane Avenue Bridge is a cable-stayed bridge over the Olentangy River in the American city of Columbus, Ohio. Designed by Jones-Stuckey Ltd., the construction was completed on November 14, 2003, after only sixteen months, five months ahead of schedule. The bridge is 113 meters (371 feet) in length, carrying six 3.5 meters (11 feet) wide lanes for vehicle traffic, as well as two 3.5 meter sidewalks. The cable stayed design was chosen for aesthetic reasons, as well as having a smaller potential for environmental degradation on the river environment. The anchorages for the cables, at 47 tons (104,000 lbs), are noted as being the heaviest single pieces of steel ever to be galvanized. Total price for the project was US$15.6 million with the following funding sources: * $5 million from the * $5 million from the Federal Highway Administration * $3.2 million from the Franklin County Engineer's Office * $2.4 million from the City of Columbus Previously, traffic on Lane Avenue was carried by a 3 lane earth filled arch bridge, which opened in 1919. By 1998, it was determined that the bridge was deteriorating; thus a replacement was needed. Construction on the new bridge started on February 27, 2002, with the old bridge being demolished on November 25 of the same year, after the final home football game at Ohio Stadium, nearby. (en)
lanes
pierswater
gold:hypernym
number of piers in water
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
bridge carries
  • Lane Avenue
building end date
  • 2003
building start date
  • 2002
length (μ)
opening date
opening year
crosses
foaf:isPrimaryTopicOf
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software