The Yellow Line 2 of the Mumbai Metro is the second metro line in the city of Mumbai connecting Dahisar in the northwest with Mandale in Mankhurd in the east. Phase One of Line 2A was partially opened on 2nd April 2022. Construction on the first section of the line, called Metro 2A (between Dahisar and D.N. Road), began in November 2016, and is expected to be completed in May 2021. This section shall be 18.589 km (11.551 mi) long, and comprise 17 of the 39 stations that form part of this route.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
foaf:homepage | |
name |
|
foaf:depiction | |
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
Link from a Wikipage to an external page | |
sameAs | |
stations |
|
dbp:wikiPageUsesTemplate | |
thumbnail | |
box width |
|
caption |
|
electrification |
|
end |
|
locale | |
logo |
|
logo width |
|
map state |
|
open |
|
owner | |
start | |
system | |
Tracks |
|
type | |
website | |
has abstract |
|
Character |
|
daily ridership |
|
depot |
|
linelength km |
|
line length (μ) |
|
number of stations | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
opening year |
|