About: Line 2 (Sound Transit)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/9CSAnqzuEr

The East Link Extension, also known as Line 2 (officially the 2 Line), is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It will be part of Sound Transit's Link light rail system, running 14 miles (23 km) from west to east and serving 10 stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. Line 2 is scheduled to open in 2024 and will continue into the Downtown Seattle Transit Tunnel and share stations with Line 1. A 3.7-mile-long (6.0 km) extension to Downtown Redmond with two additional stations is scheduled to open in 2025.

AttributesValues
rdf:type
rdfs:label
  • Line 2 (Sound Transit) (en)
  • 海湾轻轨2号线 (zh)
rdfs:comment
  • 海湾轻轨2号线(英語:Sound Transit Line 2),也叫海湾轻轨蓝线(英語:Sound Transit Blue Line)、海湾轻轨东延线(英語:East Link Extension),位于美国华盛顿州西雅图都会区,是海湾轻轨系统建设中并将服务的一条轻轨线路。线路全长14英里(23公里),呈东西走向,沿途依次经过西雅图城区、默瑟岛、贝尔维尤、雷德蒙德,设10站。2号线计划于2023年开通,未来会穿行于西雅图市中心公交隧道中与1号线共站运营。2号线在2024年会再延长两站计3.7英里(6.0公里)到雷德蒙德城区。 2号线工程于2008年由选民投票批准,预计花销37亿美元。该线将占用华盛顿湖上1989年建造的90号州际公路浮桥的部分快速车道,并在其上架设轻轨。该线路最早于1960年代所倡议,但直到90年代初海湾公共交通局成立之后才开始计划。贝尔维尤市议会在2010年代初对线路走向进行了辩论,主要分歧在于贝尔维尤市中心南两种走向的选择。辩论持续了两年多,于2013年最终确定了线路走向,并导致项目开始施工时间推迟到2016年,项目预计结束时间也由2021年推迟到2023年。该线将成为世界上第一条架设于浮桥上的轨道线路。预计该线2030年日均乘客5万人次。 (zh)
  • The East Link Extension, also known as Line 2 (officially the 2 Line), is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It will be part of Sound Transit's Link light rail system, running 14 miles (23 km) from west to east and serving 10 stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. Line 2 is scheduled to open in 2024 and will continue into the Downtown Seattle Transit Tunnel and share stations with Line 1. A 3.7-mile-long (6.0 km) extension to Downtown Redmond with two additional stations is scheduled to open in 2025. (en)
foaf:name
  • Line 2 (en)
foaf:homepage
name
  • Line 2 (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Interstate_90_floating_bridges_after_Blue_Angels_performance_-_02.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/East_Link_Extension_groundbreaking,_April_22,_2016_-_01.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/East_Link_alignments_in_Bellevue,_2010.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/East_Link_map_with_stations.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/East_Link_tracks_and_catenary_on_East_Channel_Bridge,_July_2019.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Line_2_(Sound_Transit)_icon.svg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Mercer_Island_East_Link_under_construction_01.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 71 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software