Red Line 7 of the Mumbai Metro is part of the metro system for the city of Mumbai, India. The 33.5 km (20.8 mi) line is partially elevated (16.475 km (10.237 mi) section completed, and 13.5 km (8.4 mi) under construction) and partially underground (3.5 km (2.2 mi) underground section under construction), and consists of 29 (14 elevated under construction, 12 elevated approved and 3 underground approved) stations, stretching from Golden Nest, Bhayander in the north as Metro 9 to CSMIA T2 in the south as Line 7A.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Line 7 (Mumbai Metro) (en)
|
rdfs:comment
| - Red Line 7 of the Mumbai Metro is part of the metro system for the city of Mumbai, India. The 33.5 km (20.8 mi) line is partially elevated (16.475 km (10.237 mi) section completed, and 13.5 km (8.4 mi) under construction) and partially underground (3.5 km (2.2 mi) underground section under construction), and consists of 29 (14 elevated under construction, 12 elevated approved and 3 underground approved) stations, stretching from Golden Nest, Bhayander in the north as Metro 9 to CSMIA T2 in the south as Line 7A. (en)
|
foaf:name
| - 40px|link=Mumbai MetroMumbai Metro Red Line 7 (en)
|
foaf:homepage
| |
name
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
stations
| |
stock
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
caption
| - Metro line 7 inaugural run (en)
|
electrification
| |
end
| - Andheri and CSMIA International (en)
|
locale
| |
logo
| - Maha Mumbai Metro.png (en)
|
map state
| |
open
| |
operator
| |
owner
| |
start
| |
status
| |
system
| |
type
| |
website
| |
has abstract
| - Red Line 7 of the Mumbai Metro is part of the metro system for the city of Mumbai, India. The 33.5 km (20.8 mi) line is partially elevated (16.475 km (10.237 mi) section completed, and 13.5 km (8.4 mi) under construction) and partially underground (3.5 km (2.2 mi) underground section under construction), and consists of 29 (14 elevated under construction, 12 elevated approved and 3 underground approved) stations, stretching from Golden Nest, Bhayander in the north as Metro 9 to CSMIA T2 in the south as Line 7A. (en)
|
Character
| |
depot
| |
linelength km
| |
linenumber
| |
line length (μ)
| |
number of stations
| |
railway rolling stock
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening date
| |
opening year
| |
status
| - (Partially Open & Partially Under Construction)
|
is part of
| |
operator
| |
owner
| |
type
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |