About: List of Chennai Metro stations     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FList_of_Chennai_Metro_stations&invfp=IFP_OFF&sas=SAME_AS_OFF

The Chennai Metro is a rapid transit system serving the city of Chennai and its suburbs. Phase I of the project consisted of two corridors covering a length of 54.15 kilometres (33.65 mi). The elevated section of the project began operations in June 2015, with the entire elevated stretch operational as of October 2016. The entire project completed within the financial year 2019-2020. About 55% of the corridors in Phase I are underground and the remaining corridors are elevated. Phase II is currently under construction.

AttributesValues
rdfs:label
  • List of Chennai Metro stations (en)
rdfs:comment
  • The Chennai Metro is a rapid transit system serving the city of Chennai and its suburbs. Phase I of the project consisted of two corridors covering a length of 54.15 kilometres (33.65 mi). The elevated section of the project began operations in June 2015, with the entire elevated stretch operational as of October 2016. The entire project completed within the financial year 2019-2020. About 55% of the corridors in Phase I are underground and the remaining corridors are elevated. Phase II is currently under construction. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Chennai_Metro_map.svg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • The Chennai Metro is a rapid transit system serving the city of Chennai and its suburbs. Phase I of the project consisted of two corridors covering a length of 54.15 kilometres (33.65 mi). The elevated section of the project began operations in June 2015, with the entire elevated stretch operational as of October 2016. The entire project completed within the financial year 2019-2020. About 55% of the corridors in Phase I are underground and the remaining corridors are elevated. Phase II is currently under construction. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software