About: Mackenzie Valley Pipeline Inquiry     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Unit108189659, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FMackenzie_Valley_Pipeline_Inquiry&invfp=IFP_OFF&sas=SAME_AS_OFF

The Mackenzie Valley Pipeline Inquiry, also known as the Berger Inquiry after its head Justice Thomas Berger, was commissioned by the Government of Canada on March 21, 1974, to investigate the social, environmental, and economic impact of a proposed gas pipeline that would run through the Yukon and the Mackenzie River Valley of the Northwest Territories. This proposed pipeline became known as the Mackenzie Valley Pipeline.

AttributesValues
rdf:type
rdfs:label
  • Mackenzie Valley Pipeline Inquiry (en)
rdfs:comment
  • The Mackenzie Valley Pipeline Inquiry, also known as the Berger Inquiry after its head Justice Thomas Berger, was commissioned by the Government of Canada on March 21, 1974, to investigate the social, environmental, and economic impact of a proposed gas pipeline that would run through the Yukon and the Mackenzie River Valley of the Northwest Territories. This proposed pipeline became known as the Mackenzie Valley Pipeline. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Mackenzie Valley Pipeline Inquiry, also known as the Berger Inquiry after its head Justice Thomas Berger, was commissioned by the Government of Canada on March 21, 1974, to investigate the social, environmental, and economic impact of a proposed gas pipeline that would run through the Yukon and the Mackenzie River Valley of the Northwest Territories. This proposed pipeline became known as the Mackenzie Valley Pipeline. The inquiry cost C$5.3 million, and produced over 40,000 pages of text and evidence, comprising 283 volumes. The commission recommended that no pipeline be built through the northern Yukon and that a pipeline through the Mackenzie Valley should be delayed for 10 years. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is rdfs:seeAlso of
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 53 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software