The McGinness Hills Geothermal Complex is a complex of 3 geothermal power stations located in a valley between the Toiyabe Range and Simpson Park Range in Lander County, Nevada. It is the largest geothermal complex in Nevada and the fourth largest in the United States. The complex consists of two 45 MW geothermal power stations that were commissioned in July 2012, as well as a third 48 MW geothermal power station that was commissioned on 20 December 2018. The entire complex is owned by Ormat.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
dbp:wikiPageUsesTemplate | |
thumbnail | |
country | |
location | |
operator | |
owner | |
status |
|
commissioned |
|
georss:point |
|
has abstract |
|
geo type | |
name official |
|
ps annual generation |
|
ps electrical capacity |
|
ps units operational |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
opening date |
|
opening year | |
status |
|
average annual gro...er generation (J) |
|
installed capacity (W) |
|
country | |
operator | |
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is foaf:primaryTopic of |