About: Millerhill Recycling and Energy Recovery Centre     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : geo:SpatialThing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FMillerhill_Recycling_and_Energy_Recovery_Centre&invfp=IFP_OFF&sas=SAME_AS_OFF

Millerhill Recycling and Energy Recovery Centre is a recycling and waste incineration facility at Millerhill in Midlothian, near Edinburgh in Scotland. It was built on part of the site of the Millerhill Marshalling Yard; construction began in October 2016 and the plant opened fully in September 2019. Commissioned by the City of Edinburgh Council and Midlothian Council, the plant cost £142 million and will divert 155,000 tons of waste a year from going to landfill. It burns treated waste to generate electricity which is fed into the National Grid. The plant uses combustion and XeroSorp flue gas treatment from Hitachi Zosen Inova. This is a dry adsorption system which uses sodium bicarbonate to clean the exhaust.

AttributesValues
rdf:type
rdfs:label
  • Millerhill Recycling and Energy Recovery Centre (en)
rdfs:comment
  • Millerhill Recycling and Energy Recovery Centre is a recycling and waste incineration facility at Millerhill in Midlothian, near Edinburgh in Scotland. It was built on part of the site of the Millerhill Marshalling Yard; construction began in October 2016 and the plant opened fully in September 2019. Commissioned by the City of Edinburgh Council and Midlothian Council, the plant cost £142 million and will divert 155,000 tons of waste a year from going to landfill. It burns treated waste to generate electricity which is fed into the National Grid. The plant uses combustion and XeroSorp flue gas treatment from Hitachi Zosen Inova. This is a dry adsorption system which uses sodium bicarbonate to clean the exhaust. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 55.9249 -3.0854
has abstract
  • Millerhill Recycling and Energy Recovery Centre is a recycling and waste incineration facility at Millerhill in Midlothian, near Edinburgh in Scotland. It was built on part of the site of the Millerhill Marshalling Yard; construction began in October 2016 and the plant opened fully in September 2019. Commissioned by the City of Edinburgh Council and Midlothian Council, the plant cost £142 million and will divert 155,000 tons of waste a year from going to landfill. It burns treated waste to generate electricity which is fed into the National Grid. The plant uses combustion and XeroSorp flue gas treatment from Hitachi Zosen Inova. This is a dry adsorption system which uses sodium bicarbonate to clean the exhaust. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-3.0854001045227 55.924900054932)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software